reservoirs.earth logo
Reservoirs.EARTH
Tripura

Reservoir · Tripura · India · CWC · EASTERN region

Gumti

Gumti Dam

97.8% full

Gross capacity

35.1 TMC (994 MCM)

Live capacity

28.3 TMC (800 MCM)

River

Gumti

Basin

Barak

Primary use

hydropower

Operator

TSECL

Coordinates

23.442°N, 91.500°E

Last updated

2026-09-10

Capacity in TMC

Gumti Dam has a gross capacity of 35.1 TMC (994 MCM), of which 28.3 TMC (800 MCM) is live storage; it is currently at 98% full, holding 10.8 TMC (305 MCM).

Gross capacity
35.1 TMC (994 MCM)
Live capacity
28.3 TMC (800 MCM)
Current storage
10.8 TMC (305 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.

Current fill

97.8%
High

vs 7 days ago

-1.0%

losing

vs 1 year ago

+1.3%

year-over-year

7-day trend

stable

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: EASTERN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 23.442, 91.500 · Open in Google Maps

About Gumti Dam

As of September 10, 2026, Gumti Dam is filled to 97.8% of its total capacity, holding 10.8 TMC (305 MCM) of a gross 35.1 TMC (994 MCM). At this level the reservoir is high. Of that total, 28.3 TMC (800 MCM) is live storage.

Over the most recent week on record the fill level has held broadly steady (-1.0 pts), and it is 1.3 points above its level on the same date a year earlier.

Across the readings we hold for Gumti Dam — 145 data points between June 7, 2023 and September 10, 2026 — the level has ranged from a low of 27.0% (June 14, 2023) to a high of 100.0% (October 9, 2025). On average the reservoir is fullest around October and at its lowest around April.

It is operated by TSECL primarily for hydroelectric power. It lies within the Barak basin at 23.442°N, 91.500°E.

Key facts

Current fill level
97.8%
Water stored
10.8 TMC (305 MCM)
Total capacity
35.1 TMC (994 MCM)
Usable capacity
28.3 TMC (800 MCM)
7-day change
▼ 1.0 pts
Year-on-year
▲ 1.3 pts
Primary use
Hydroelectric power
River
Gumti
River basin
Barak
Operator
TSECL
Coordinates
23.442°N, 91.500°E
Last updated
September 10, 2026

Recent readings

DateFill levelVolume (hm³)
10 Sep 202697.8%305
3 Sep 202698.7%308
27 Aug 202694.9%296
20 Aug 202692.0%287
13 Aug 202692.6%289
6 Aug 202689.1%278
30 Jul 202679.8%249
23 Jul 202690.7%283
16 Jul 202691.3%285
9 Jul 202676.9%240
2 Jul 202671.8%224
25 Jun 202671.2%222

Nearby reservoirs

ShareXLinkedInWhatsApp