reservoirs.earth logo
Reservoirs.EARTH
← Assam

Reservoir · Assam · India · CWC · EASTERN region

Kopili (Umrong)

Kopili HES — Umrong Dam

81.1% full

Gross capacity

37.2 TMC (1,052 MCM)

Live capacity

37.2 TMC (1,052 MCM)

River

Kopili

Basin

Brahmaputra

Primary use

hydropower

Operator

NEEPCO

Coordinates

25.990°N, 93.220°E

Last updated

2026-09-24

Capacity in TMC

Kopili (Umrong) Dam has a gross capacity of 37.2 TMC (1,052 MCM); it is currently at 81% full, holding 4.6 TMC (129 MCM).

Gross capacity
37.2 TMC (1,052 MCM)
Live capacity
37.2 TMC (1,052 MCM)
Current storage
4.6 TMC (129 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.

⏳Data older than 14 days — last reading 2026-09-24. Shown for reference; it may not reflect current levels.

Current fill

81.1%
High

vs 7 days ago

-1.7%

losing

vs 1 year ago

+24.4%

year-over-year

7-day trend

↓

falling

Drought context

Storage vs September average

116%of normal

81.1% full on 2026-09-24, against an average of 70.0% for September across 2 years of readings (+11.1 points).

Rain over the last three months · 21 September 2026

Near normal

In the three months to 21 September 2026 the area around Kopili (Umrong) had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.42). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: EASTERN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 25.990, 93.220 · Open in Google Maps

About Kopili HES — Umrong Dam

As of September 24, 2026, Kopili HES — Umrong Dam is filled to 81.1% of its total capacity, holding 4.6 TMC (129 MCM) of a gross 37.2 TMC (1,052 MCM). At this level the reservoir is high.

Over the most recent week on record the fill level has fallen by 1.7 percentage points, and it is 24.4 points above its level on the same date a year earlier.

Across the readings we hold for Kopili HES — Umrong Dam — 73 data points between April 3, 2025 and September 24, 2026 — the level has ranged from a low of 25.3% (April 23, 2026) to a high of 100.0% (September 3, 2026). On average the reservoir is fullest around September and at its lowest around March.

It is operated by NEEPCO primarily for hydroelectric power. It lies within the Brahmaputra basin at 25.990°N, 93.220°E.

Key facts

Current fill level
81.1%
Water stored
4.6 TMC (129 MCM)
Total capacity
37.2 TMC (1,052 MCM)
7-day change
▼ 1.7 pts
Year-on-year
▲ 24.4 pts
Primary use
Hydroelectric power
River
Kopili
River basin
Brahmaputra
Operator
NEEPCO
Coordinates
25.990°N, 93.220°E
Last updated
September 24, 2026

Recent readings

DateFill levelVolume (hm³)
24 Sep 202681.0%129
17 Sep 202682.8%132
10 Sep 202681.9%130
3 Sep 2026100.0%159
27 Aug 202682.3%131
20 Aug 202682.3%131
13 Aug 202680.2%128
6 Aug 202681.9%130
30 Jul 202681.1%129
23 Jul 202681.1%129
16 Jul 202680.5%128
9 Jul 202676.1%121

Nearby reservoirs

ShareXLinkedInWhatsApp