23.7% of gross capacity

Gross capacity

6.4 TMC (180 MCM)

Live capacity

6.4 TMC (180 MCM)

River

Kopili

Basin

Brahmaputra

Primary use

hydropower

Operator

NEEPCO

Coordinates

25.870°N, 93.170°E

Last updated

2026-10-22

Capacity in TMC

Khandong Dam has a gross capacity of 6.4 TMC (180 MCM); it is currently at 23.7% of gross capacity, holding 1.5 TMC (43 MCM).

Gross capacity
6.4 TMC (180 MCM)
Live capacity
6.4 TMC (180 MCM)
Current storage
1.5 TMC (43 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

23.7%
Low

vs 7 days ago

-3.6 pp

losing

vs 1 year ago

-20.2 pp

year-over-year

7-day trend

↓

falling

Drought context

Storage vs October average

52%of normal

23.7% full on 2026-10-22, against an average of 46.0% for October across 2 years of readings (-22.3 points).

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Khandong had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.90). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC. CWC region: EASTERN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 25.870°N, 93.170°E · Open in Google Maps

About Khandong Dam

As of October 22, 2026, Khandong Dam is filled to 23.7% of its gross capacity, holding 1.5 TMC (43 MCM) of a gross 6.4 TMC (180 MCM). At this level the reservoir is low.

Over the most recent week on record the fill level has fallen by 3.6 percentage points, and it is 20.2 points below its level on the same date a year earlier.

Across the readings we hold for Khandong Dam — 77 data points between April 3, 2025 and October 22, 2026 — the level has ranged from a low of 5.1% (March 12, 2026) to a high of 86.1% (August 28, 2025). On average the reservoir is fullest around August and at its lowest around March.

It is operated by NEEPCO primarily for hydroelectric power. It lies within the Brahmaputra basin at 25.870°N, 93.170°E.

Key facts

Current fill level
23.7% of total capacity
Water stored
1.5 TMC (43 MCM)
Total capacity
6.4 TMC (180 MCM)
7-day change
▼ 3.6 pp
Year-on-year
▼ 20.2 pp
Primary use
Hydroelectric power
River
Kopili
River basin
Brahmaputra
Operator
NEEPCO
Coordinates
25.870°N, 93.170°E
Last updated
October 22, 2026

Recent readings

DateFill levelVolume (hm³)
22 Oct 202623.7%43
15 Oct 202627.3%49
8 Oct 202629.7%53
1 Oct 202631.0%56
24 Sep 202633.8%61
17 Sep 202642.6%77
10 Sep 202652.2%94
3 Sep 202661.2%110
27 Aug 202658.7%106
20 Aug 202660.8%109
13 Aug 202668.6%123
6 Aug 202677.3%139