← Jharkhand

Reservoir · Jharkhand · India · CWC · EASTERN region

Massanjore (Mayurakshi)

Massanjore Dam

42.1% full

Gross capacity

22.7 TMC (642 MCM)

Live capacity

21.3 TMC (603 MCM)

River

Mayurakshi

Basin

Ganga

Primary use

irrigation

Reported

October 29, 2026

Capacity in TMC

Massanjore (Mayurakshi) Dam has a gross capacity of 22.7 TMC (642 MCM), of which 21.3 TMC (603 MCM) is live storage; it is currently at 42.1% full, holding 8.2 TMC (231 MCM).

Gross capacity
22.7 TMC (642 MCM)
Live capacity
21.3 TMC (603 MCM)
Current storage
8.2 TMC (231 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

42.1%
Normal

vs 7 days ago

-5.3 pp

losing

vs 1 year ago

-2.5 pp

year-over-year

7-day trend

↓

falling

Drought context

India drought →

Storage vs October average

70%of normal

42.1% now · 60.0% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.04 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
29 Oct 202642.1%231
22 Oct 202647.4%260
15 Oct 202654.6%300
8 Oct 202655.0%302
1 Oct 202656.3%309
24 Sep 202649.5%272
17 Sep 202651.4%282
10 Sep 202645.7%251
3 Sep 202645.5%250
27 Aug 202642.6%234
20 Aug 202640.4%222
13 Aug 202637.3%205

Weekly storage

Fill history — multi-year

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

OperatorJH/WB
Coordinates24.167°N, 87.650°E

About this reservoir

Data source

official

Storage data: CWC. CWC region: EASTERN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 24.167°N, 87.650°E · Open in Google Maps

About Massanjore Dam

As of October 29, 2026, Massanjore Dam has a published fill of 42.1%, holding 8.2 TMC (231 MCM). Gross capacity is 22.7 TMC (642 MCM). At this level the reservoir is within its normal operating range. Of that total, 21.3 TMC (603 MCM) is live storage.

Over the most recent week on record the fill level has fallen by 5.3 percentage points, and it is 2.5 points below its level on the same date a year earlier.

Across the readings we hold for Massanjore Dam — 172 data points between June 8, 2023 and October 29, 2026 — the level has ranged from a low of 16.4% (May 21, 2026) to a high of 100.0% (August 31, 2023). On average the reservoir is fullest around October and at its lowest around May.

It is operated by JH/WB primarily for irrigation. It lies within the Ganga basin at 24.167°N, 87.650°E.

Nearby reservoirs