reservoirs.earth logo
Reservoirs.EARTH
URUGUAI
NormalHydroelectric

PASSO FUNDO

Rio Grande do Sul · URUGUAI

Capacity

1,589 hm³

Coordinates

-27.554°N, 52.741°W

Operator

ONS

Current fill

53.9%
Normal

vs 7 days ago

-1.7%

losing

vs 1 year ago

-9.9%

year-over-year

7-day trend

falling

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity1,589 hm³
Usable capacity1,404.61 hm³
Primary useHydroelectric
OperatorONS
RiverPASSO FUNDO
ProvinceRio Grande do Sul
River basinURUGUAI
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-06-10

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -27.554, -52.741 · Open in Google Maps

About PASSO FUNDO

As of June 10, 2026, PASSO FUNDO is filled to 53.9% of its total capacity, holding roughly 757 hm³ of water out of a maximum 1,589 hm³. At this level the reservoir is within its normal operating range. Of that total, about 1,405 hm³ is usable (live) storage.

Over the most recent week on record the fill level has fallen by 1.7 percentage points, and it is 9.9 points below its level on the same date a year earlier.

Across the readings we hold for PASSO FUNDO — 52 data points between June 27, 2025 and June 10, 2026 — the level has ranged from a low of 51.7% (April 24, 2026) to a high of 96.2% (November 14, 2025). On average the reservoir is fullest around November and at its lowest around April.

It is operated by ONS primarily for hydroelectric power. It lies within the URUGUAI basin at 27.554°S, 52.741°W.

Key facts

Current fill level
53.9%
Water stored
757 hm³
Total capacity
1,589 hm³
Usable capacity
1,405 hm³
7-day change
▼ 1.7 pts
Year-on-year
▼ 9.9 pts
Primary use
Hydroelectric power
River
PASSO FUNDO
River basin
URUGUAI
Operator
ONS
Coordinates
27.554°S, 52.741°W
Last updated
June 10, 2026

Recent readings

DateFill levelVolume (hm³)
10 Jun 202653.9%757
5 Jun 202655.6%781
29 May 202655.7%782
22 May 202655.2%775
15 May 202655.3%776
8 May 202654.5%766
1 May 202652.2%733
24 Apr 202651.7%726
17 Apr 202653.6%753
10 Apr 202655.2%776
3 Apr 202656.5%794
27 Mar 202658.7%824

Frequently asked questions

What is the current water level of PASSO FUNDO?

As of June 10, 2026, PASSO FUNDO is at 53.9% of its capacity, holding approximately 757 hm³ of water, according to ONS – Operador Nacional do Sistema Elétrico data.

Is PASSO FUNDO reservoir full?

No. As of June 10, 2026, PASSO FUNDO is within its normal operating range at 53.9% of its capacity, so it is not full.

Is the water level at PASSO FUNDO rising or falling?

The level at PASSO FUNDO is falling — it dropped 1.7 percentage points over the latest week on record.

How much water can PASSO FUNDO hold?

PASSO FUNDO has a total capacity of 1,589 hm³, of which about 1,405 hm³ is usable storage.

Where is PASSO FUNDO reservoir located?

PASSO FUNDO is located in Rio Grande do Sul, Brazil, within the URUGUAI basin (coordinates 27.554°S, 52.741°W).

What is PASSO FUNDO used for?

PASSO FUNDO is used primarily for hydroelectric power, and is managed by ONS.

Nearby reservoirs

ShareXLinkedInWhatsApp