← URUGUAI
HighHydroelectric

BARRA GRANDE

Santa Catarina · URUGUAI

Useful capacity

2,046.59 hm³

Reported

November 15, 2026

93.8% of useful capacity

Current fill

93.8%

of useful capacity

High

vs 7 days ago

-2.4 pp

losing

vs 1 year ago

-5.1 pp

year-over-year

7-day trend

↓

falling

Drought context

Brazil drought →

Storage vs November average

97%of normal

93.8% now · 96.7% average (2 yrs)

Rainfall, last 3 months

Very wet

SPI-3 +1.83 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
15 Nov 202693.8%1,919
14 Nov 202693.3%1,910
13 Nov 202693.8%1,919
12 Nov 202695.2%1,948
11 Nov 202696.4%1,974
10 Nov 202697.0%1,985
9 Nov 202695.8%1,962
8 Nov 202696.2%1,968
7 Nov 202696.0%1,964
6 Nov 202695.5%1,954
5 Nov 202694.8%1,940
4 Nov 202693.4%1,911

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity2,047 hm³
OperatorONS
RiverPELOTAS
Coordinates27.777°S, 51.189°W
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-11-15

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 27.777°S, 51.189°W · Open in Google Maps

About BARRA GRANDE

As of November 15, 2026, BARRA GRANDE is at 93.8% of useful capacity, holding 1,919 hm³ of 2,047 hm³. Of the 4,784 hm³ total capacity, that is 40.1%. At this level the reservoir is high.

Over the most recent week on record the fill level has fallen by 2.4 percentage points, and it is 5.1 points below its level on the same date a year earlier.

Across the readings we hold for BARRA GRANDE — 65 data points between November 15, 2025 and November 15, 2026 — the level has ranged from a low of 29.4% (March 13, 2026) to a high of 98.9% (November 15, 2025). On average the reservoir is fullest around August and at its lowest around March.

It is operated by ONS primarily for hydroelectric power. It lies within the URUGUAI basin at 27.777°S, 51.189°W.

Nearby reservoirs