← URUGUAI
NormalHydroelectric

ITÁ

Rio Grande do Sul · URUGUAI

Useful capacity

777.54 hm³

Reported

November 15, 2026

64.2% of useful capacity

Current fill

64.2%

of useful capacity

Normal

vs 7 days ago

-7.1 pp

losing

vs 1 year ago

-28.3 pp

year-over-year

7-day trend

↓

falling

Drought context

Brazil drought →

Storage vs November average

81%of normal

64.2% now · 78.8% average (2 yrs)

Rainfall, last 3 months

Very wet

SPI-3 +1.73 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
15 Nov 202664.2%498.8
14 Nov 202660.7%471.9
13 Nov 202659.3%461.4
12 Nov 202663.9%496.8
11 Nov 202668.0%528.5
10 Nov 202668.7%533.8
9 Nov 202667.8%527.2
8 Nov 202671.2%553.7
7 Nov 202671.0%552.4
6 Nov 202663.4%492.9
5 Nov 202676.7%596.5
4 Nov 202664.1%498.1

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity777.54 hm³
OperatorONS
Coordinates27.282°S, 52.386°W
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-11-15

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 27.282°S, 52.386°W · Open in Google Maps

About ITÁ

As of November 15, 2026, ITÁ is at 64.2% of useful capacity, holding 498.8 hm³ of 777.54 hm³. Of the 5,060 hm³ total capacity, that is 9.9%. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has fallen by 7.1 percentage points, and it is 28.3 points below its level on the same date a year earlier.

Across the readings we hold for ITÁ — 65 data points between November 15, 2025 and November 15, 2026 — the level has ranged from a low of 49.8% (August 28, 2026) to a high of 92.5% (November 15, 2025). On average the reservoir is fullest around December and at its lowest around October.

It is operated by ONS primarily for hydroelectric power. It lies within the URUGUAI basin at 27.282°S, 52.386°W.

Nearby reservoirs