← URUGUAI
HighHydroelectric

CAMPOS NOVOS

Santa Catarina · URUGUAI

Useful capacity

169.32 hm³

Reported

November 15, 2026

85.6% of useful capacity

Current fill

85.6%

of useful capacity

High

vs 7 days ago

-2.8 pp

losing

vs 1 year ago

-6.8 pp

year-over-year

7-day trend

↓

falling

Drought context

Brazil drought →

Storage vs November average

97%of normal

85.6% now · 88.5% average (2 yrs)

Rainfall, last 3 months

Very wet

SPI-3 +1.95 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
15 Nov 202685.6%144.9
14 Nov 202681.1%137.3
13 Nov 202680.3%135.9
12 Nov 202681.3%137.7
11 Nov 202678.6%133.1
10 Nov 202680.5%136.3
9 Nov 202679.5%134.5
8 Nov 202688.4%149.7
7 Nov 202690.3%152.9
6 Nov 202686.1%145.8
5 Nov 202693.9%158.9
4 Nov 202692.2%156.1

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity169.32 hm³
OperatorONS
RiverCANOAS
Coordinates27.603°S, 51.324°W
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-11-15

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 27.603°S, 51.324°W · Open in Google Maps

About CAMPOS NOVOS

As of November 15, 2026, CAMPOS NOVOS is at 85.6% of useful capacity, holding 144.9 hm³ of 169.32 hm³. Of the 1,709 hm³ total capacity, that is 8.5%. At this level the reservoir is high.

Over the most recent week on record the fill level has fallen by 2.8 percentage points, and it is 6.8 points below its level on the same date a year earlier.

Across the readings we hold for CAMPOS NOVOS — 65 data points between November 15, 2025 and November 15, 2026 — the level has ranged from a low of 15.0% (March 20, 2026) to a high of 94.9% (July 3, 2026). On average the reservoir is fullest around July and at its lowest around March.

It is operated by ONS primarily for hydroelectric power. It lies within the URUGUAI basin at 27.603°S, 51.324°W.