← JACUI
NormalHydroelectric

PASSO REAL

Rio Grande do Sul · JACUI

Useful capacity

3,409.2 hm³

Reported

November 15, 2026

64.3% of useful capacity

Current fill

64.3%

of useful capacity

Normal

vs 7 days ago

-2.3 pp

losing

vs 1 year ago

-11.2 pp

year-over-year

7-day trend

↓

falling

Drought context

Brazil drought →

Storage vs November average

91%of normal

64.3% now · 70.3% average (2 yrs)

Rainfall, last 3 months

Very wet

SPI-3 +1.50 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
15 Nov 202664.3%2,191
14 Nov 202664.5%2,200
13 Nov 202664.4%2,196
12 Nov 202664.4%2,196
11 Nov 202664.7%2,207
10 Nov 202664.4%2,196
9 Nov 202665.2%2,223
8 Nov 202666.5%2,269
7 Nov 202667.6%2,305
6 Nov 202667.8%2,313
5 Nov 202667.1%2,289
4 Nov 202665.4%2,229

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity3,409 hm³
OperatorONS
RiverJACUÍ
Coordinates29.015°S, 53.187°W
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-11-15

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 29.015°S, 53.187°W · Open in Google Maps

About PASSO REAL

As of November 15, 2026, PASSO REAL is at 64.3% of useful capacity, holding 2,191 hm³ of 3,409 hm³. Of the 3,703 hm³ total capacity, that is 59.2%. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has fallen by 2.3 percentage points, and it is 11.2 points below its level on the same date a year earlier.

Across the readings we hold for PASSO REAL — 65 data points between November 15, 2025 and November 15, 2026 — the level has ranged from a low of 49.8% (April 3, 2026) to a high of 76.9% (January 23, 2026). On average the reservoir is fullest around January and at its lowest around April.

It is operated by ONS primarily for hydroelectric power. It lies within the JACUI basin at 29.015°S, 53.187°W.

Nearby reservoirs