Reservoir · South Australia · Australia · BOM Water Data Online
Lock 5 - Renmark
62.5% full
Capacity
36.9 hm³
Volume stored
23 hm³
River
River Murray
Year completed
1927
Coordinates
34.183°S, 140.775°E
Last updated
2026-09-08
Current fill
62.5%vs 7 days ago
+0.1%gaining
vs 1 year ago
-0.4%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-08.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -34.183, 140.775 · Open in Google Maps
About Lock 5 - Renmark
As of September 8, 2026, Lock 5 - Renmark is filled to 62.5% of its total capacity, holding roughly 23 hm³ of water out of a maximum 37 hm³. At this level the reservoir is within its normal operating range. Of that total, about 23 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (+0.1 pts), and it sits close to where it was a year earlier.
Across the readings we hold for Lock 5 - Renmark — 1095 data points between September 10, 2023 and September 8, 2026 — the level has ranged from a low of 58.8% (April 16, 2026) to a high of 69.9% (October 22, 2025). On average the reservoir is fullest around October and at its lowest around April.
The dam at Lock 5 - Renmark was completed in 1927. It is operated by BOM primarily for water supply. It lies within the River Murray Basin basin at 34.183°S, 140.775°E.
Key facts
- Current fill level
- 62.5%
- Water stored
- 23 hm³
- Total capacity
- 37 hm³
- Usable capacity
- 23 hm³
- 7-day change
- ▲ 0.1 pts
- Year-on-year
- ▼ 0.4 pts
- Primary use
- Water supply
- River
- River Murray
- River basin
- River Murray Basin
- Year completed
- 1927
- Operator
- BOM
- Coordinates
- 34.183°S, 140.775°E
- Last updated
- September 8, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 8 Sep 2026 | 62.5% | 23 |
| 7 Sep 2026 | 62.4% | 23 |
| 6 Sep 2026 | 62.2% | 23 |
| 5 Sep 2026 | 62.2% | 23 |
| 4 Sep 2026 | 62.2% | 23 |
| 3 Sep 2026 | 62.2% | 23 |
| 2 Sep 2026 | 62.2% | 23 |
| 1 Sep 2026 | 62.4% | 23 |
| 31 Aug 2026 | 62.9% | 23 |
| 30 Aug 2026 | 62.7% | 23 |
| 29 Aug 2026 | 62.4% | 23 |
| 28 Aug 2026 | 62.2% | 23 |

