Reservoir · South Australia · Australia · BOM Water Data Online
Lock 1 - Blanchetown
49.6% full
Capacity
56.5 hm³
Volume stored
28 hm³
River
River Murray
Year completed
1922
Coordinates
34.327°S, 139.618°E
Last updated
2026-09-09
Current fill
49.6%vs 7 days ago
0.0%stable
vs 1 year ago
-0.7%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-09.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -34.327, 139.618 · Open in Google Maps
About Lock 1 - Blanchetown
As of September 9, 2026, Lock 1 - Blanchetown is filled to 49.6% of its total capacity, holding roughly 28 hm³ of water out of a maximum 57 hm³. At this level the reservoir is within its normal operating range. Of that total, about 28 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it sits close to where it was a year earlier.
Across the readings we hold for Lock 1 - Blanchetown — 1095 data points between September 11, 2023 and September 9, 2026 — the level has ranged from a low of 47.2% (March 26, 2024) to a high of 52.9% (September 20, 2023). On average the reservoir is fullest around February and at its lowest around March.
The dam at Lock 1 - Blanchetown was completed in 1922. It is operated by BOM primarily for water supply. It lies within the River Murray Basin basin at 34.327°S, 139.618°E.
Key facts
- Current fill level
- 49.6%
- Water stored
- 28 hm³
- Total capacity
- 57 hm³
- Usable capacity
- 28 hm³
- 7-day change
- No change
- Year-on-year
- ▼ 0.7 pts
- Primary use
- Water supply
- River
- River Murray
- River basin
- River Murray Basin
- Year completed
- 1922
- Operator
- BOM
- Coordinates
- 34.327°S, 139.618°E
- Last updated
- September 9, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 9 Sep 2026 | 49.6% | 28 |
| 8 Sep 2026 | 49.7% | 28 |
| 7 Sep 2026 | 49.6% | 28 |
| 6 Sep 2026 | 49.7% | 28 |
| 5 Sep 2026 | 49.8% | 28 |
| 4 Sep 2026 | 50.0% | 28 |
| 3 Sep 2026 | 49.8% | 28 |
| 2 Sep 2026 | 49.6% | 28 |
| 1 Sep 2026 | 49.6% | 28 |
| 31 Aug 2026 | 49.9% | 28 |
| 30 Aug 2026 | 49.9% | 28 |
| 29 Aug 2026 | 49.6% | 28 |

