← South Australia

Reservoir · South Australia · Australia · BOM Water Data Online

Lock 2 - Waikerie

68.9% full

Capacity

40.4 hm³

Volume stored

28 hm³

River

River Murray

Year completed

1928

Coordinates

34.084°S, 139.949°E

Last updated

2026-10-26

Current fill

68.9%
Normal

vs 7 days ago

+1.6 pp

gaining

vs 1 year ago

-11.0 pp

year-over-year

7-day trend

↑

rising

Drought context

Storage vs October average

97%of normal

68.9% full on 2026-10-26, against an average of 71.2% for October across 4 years of readings (-2.3 points).

Rain over the last three months · 11 October 2026

Moderately wet

In the three months to 11 October 2026 the area around Lock 2 - Waikerie had more rain than normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index +1.08). Rain, not storage. Australia drought figures →

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-10-26.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 34.084°S, 139.949°E · Open in Google Maps

About Lock 2 - Waikerie

As of October 26, 2026, Lock 2 - Waikerie is filled to 68.9% of its total capacity, holding 27.83 hm³ of water out of a maximum 40.4 hm³. At this level the reservoir is within its normal operating range. Of that total, 26.9 hm³ is usable (live) storage.

Over the most recent week on record the fill level has risen by 1.6 percentage points, and it is 11.0 points below its level on the same date a year earlier.

Across the readings we hold for Lock 2 - Waikerie — 1095 data points between October 28, 2023 and October 26, 2026 — the level has ranged from a low of 64.6% (November 30, 2023) to a high of 80.1% (September 28, 2025). On average the reservoir is fullest around October and at its lowest around July.

The dam at Lock 2 - Waikerie was completed in 1928. It is operated by BOM primarily for water supply. It lies within the River Murray Basin basin at 34.084°S, 139.949°E.

Key facts

Current fill level
68.9% of total capacity
Water stored
27.83 hm³
Total capacity
40.4 hm³
Usable capacity
26.9 hm³
7-day change
▲ 1.6 pp
Year-on-year
▼ 11.0 pp
Primary use
Water supply
River
River Murray
River basin
River Murray Basin
Year completed
1928
Operator
BOM
Coordinates
34.084°S, 139.949°E
Last updated
October 26, 2026

Recent readings

DateFill levelVolume (hm³)
26 Oct 202668.9%27.83
25 Oct 202668.4%27.59
24 Oct 202667.6%27.3
23 Oct 202666.7%26.94
22 Oct 202666.5%26.86
21 Oct 202666.9%27.01
20 Oct 202667.2%27.13
19 Oct 202667.3%27.15
18 Oct 202667.3%27.15
17 Oct 202667.2%27.14
16 Oct 202666.9%26.99
15 Oct 202666.7%26.94

Nearby reservoirs