← South Australia

Reservoir · South Australia · Australia · BOM Water Data Online

Lock 4 - Bookpurnong

79.6% full

Capacity

29.4 hm³

Volume stored

23 hm³

River

River Murray

Year completed

1929

Coordinates

34.337°S, 140.577°E

Last updated

2026-10-26

Current fill

79.6%
Normal

vs 7 days ago

+1.8 pp

gaining

vs 1 year ago

+3.0 pp

year-over-year

7-day trend

↑

rising

Drought context

Storage vs October average

107%of normal

79.6% full on 2026-10-26, against an average of 74.7% for October across 4 years of readings (+4.9 points).

Rain over the last three months · 11 October 2026

Moderately wet

In the three months to 11 October 2026 the area around Lock 4 - Bookpurnong had more rain than normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index +1.12). Rain, not storage. Australia drought figures →

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-10-26.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 34.337°S, 140.577°E · Open in Google Maps

About Lock 4 - Bookpurnong

As of October 26, 2026, Lock 4 - Bookpurnong is filled to 79.6% of its total capacity, holding 23.39 hm³ of water out of a maximum 29.4 hm³. At this level the reservoir is within its normal operating range. Of that total, 20.6 hm³ is usable (live) storage.

Over the most recent week on record the fill level has risen by 1.8 percentage points, and it is 3.0 points above its level on the same date a year earlier.

Across the readings we hold for Lock 4 - Bookpurnong — 1095 data points between October 28, 2023 and October 26, 2026 — the level has ranged from a low of 68.6% (June 28, 2024) to a high of 79.6% (October 26, 2026). On average the reservoir is fullest around October and at its lowest around June.

The dam at Lock 4 - Bookpurnong was completed in 1929. It is operated by BOM primarily for water supply. It lies within the River Murray Basin basin at 34.337°S, 140.577°E.

Key facts

Current fill level
79.6% of total capacity
Water stored
23.39 hm³
Total capacity
29.4 hm³
Usable capacity
20.6 hm³
7-day change
▲ 1.8 pp
Year-on-year
▲ 3.0 pp
Primary use
Water supply
River
River Murray
River basin
River Murray Basin
Year completed
1929
Operator
BOM
Coordinates
34.337°S, 140.577°E
Last updated
October 26, 2026

Recent readings

DateFill levelVolume (hm³)
26 Oct 202679.6%23.39
25 Oct 202678.8%23.15
24 Oct 202677.7%22.83
23 Oct 202677.3%22.7
22 Oct 202676.9%22.58
21 Oct 202676.7%22.51
20 Oct 202677.1%22.65
19 Oct 202677.8%22.85
18 Oct 202678.3%23
17 Oct 202678.6%23.08
16 Oct 202678.6%23.1
15 Oct 202678.6%23.09

Nearby reservoirs