Reservoir · Queensland · Australia · BOM Water Data Online
Kroombit
11.1% full
Capacity
14.6 hm³
Volume stored
2 hm³
River
Kroombit Creek
Year completed
1992
Coordinates
24.415°S, 150.779°E
Last updated
2026-06-10
Current fill
11.1%vs 7 days ago
-0.3%losing
vs 1 year ago
-17.2%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-06-10.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -24.415, 150.779 · Open in Google Maps
About Kroombit
As of June 10, 2026, Kroombit is filled to 11.1% of its total capacity, holding roughly 2 hm³ of water out of a maximum 15 hm³. At this level the reservoir is critically low.
Over the most recent week on record the fill level has held broadly steady (-0.3 pts), and it is 17.2 points below its level on the same date a year earlier.
Across the readings we hold for Kroombit — 1095 data points between June 12, 2023 and June 10, 2026 — the level has ranged from a low of 0.4% (October 23, 2023) to a high of 42.4% (March 18, 2026). On average the reservoir is fullest around April and at its lowest around November.
The dam at Kroombit was completed in 1992. It is operated by BOM primarily for water supply. It lies within the Kroombit Creek Basin basin at 24.415°S, 150.779°E.
Key facts
- Current fill level
- 11.1%
- Water stored
- 2 hm³
- Total capacity
- 15 hm³
- 7-day change
- ▼ 0.3 pts
- Year-on-year
- ▼ 17.2 pts
- Primary use
- Water supply
- River
- Kroombit Creek
- River basin
- Kroombit Creek Basin
- Year completed
- 1992
- Operator
- BOM
- Coordinates
- 24.415°S, 150.779°E
- Last updated
- June 10, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 10 Jun 2026 | 11.1% | 2 |
| 9 Jun 2026 | 11.4% | 2 |
| 8 Jun 2026 | 11.7% | 2 |
| 7 Jun 2026 | 11.9% | 2 |
| 6 Jun 2026 | 12.2% | 2 |
| 5 Jun 2026 | 12.5% | 2 |
| 4 Jun 2026 | 12.8% | 2 |
| 3 Jun 2026 | 13.0% | 2 |
| 2 Jun 2026 | 13.3% | 2 |
| 1 Jun 2026 | 13.5% | 2 |
| 31 May 2026 | 13.8% | 2 |
| 30 May 2026 | 14.0% | 2 |
Frequently asked questions
What is the current water level of Kroombit?
As of June 10, 2026, Kroombit is at 11.1% of its capacity, holding approximately 2 hm³ of water, according to BOM data.
Is Kroombit reservoir full?
No. As of June 10, 2026, Kroombit is critically low at 11.1% of its capacity, so it is not full.
Is the water level at Kroombit rising or falling?
The level at Kroombit has been broadly stable over the latest week on record (-0.3 points).
How much water can Kroombit hold?
Kroombit has a total capacity of 15 hm³.
Where is Kroombit reservoir located?
Kroombit is located in Queensland, Australia, within the Kroombit Creek Basin basin (coordinates 24.415°S, 150.779°E).
When was Kroombit dam built?
The dam at Kroombit was completed in 1992.
What is Kroombit used for?
Kroombit is used primarily for water supply, and is managed by BOM.

