← Queensland

Reservoir · Queensland · Australia · BOM Water Data Online

Callide

17.4% full

Capacity

136.4 hm³

Volume stored

24 hm³

River

Callide Creek

Year completed

1965

Reported

November 11, 2026

Current fill

17.4%
Critical

vs 7 days ago

-0.3 pp

losing

vs 1 year ago

+1.8 pp

year-over-year

7-day trend

→

stable

Drought context

Australia drought →

Storage vs November average

108%of normal

17.4% now · 16.1% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.72 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
11 Nov 202617.4%23.73
10 Nov 202617.4%23.8
9 Nov 202617.5%23.86
8 Nov 202617.5%23.93
7 Nov 202617.5%23.93
6 Nov 202617.6%23.97
5 Nov 202617.6%24.04
4 Nov 202617.7%24.12
3 Nov 202617.7%24.19
2 Nov 202617.8%24.25
1 Nov 202617.8%24.32
31 Oct 202617.9%24.39

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Primary useWater supply
River basinCallide Creek Basin
Coordinates24.355°S, 150.642°E

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-11.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 24.355°S, 150.642°E · Open in Google Maps

About Callide

As of November 11, 2026, Callide is filled to 17.4% of its total capacity, holding 23.73 hm³ of water out of a maximum 136.4 hm³. At this level the reservoir is critically low.

Over the most recent week on record the fill level has held broadly steady (-0.3 pp), and it is 1.8 points above its level on the same date a year earlier.

Across the readings we hold for Callide — 1095 data points between November 13, 2023 and November 11, 2026 — the level has ranged from a low of 15.6% (May 30, 2024) to a high of 28.0% (March 25, 2026). On average the reservoir is fullest around April and at its lowest around December.

The dam at Callide was completed in 1965. It is operated by BOM primarily for water supply. It lies within the Callide Creek Basin basin at 24.355°S, 150.642°E.

Nearby reservoirs