Reservoir · Queensland · Australia · BOM Water Data Online
Callide
17.4% full
Capacity
136.4 hm³
Volume stored
24 hm³
River
Callide Creek
Year completed
1965
Reported
November 11, 2026
Current fill
17.4%vs 7 days ago
-0.3 pplosing
vs 1 year ago
+1.8 ppyear-over-year
7-day trend
→stable
Drought context
Australia drought →Storage vs November average
108%of normal
17.4% now · 16.1% average (4 yrs)
Rainfall, last 3 months
Near normal
SPI-3 +0.72 · to 1 Nov 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 11 Nov 2026 | 17.4% | 23.73 |
| 10 Nov 2026 | 17.4% | 23.8 |
| 9 Nov 2026 | 17.5% | 23.86 |
| 8 Nov 2026 | 17.5% | 23.93 |
| 7 Nov 2026 | 17.5% | 23.93 |
| 6 Nov 2026 | 17.6% | 23.97 |
| 5 Nov 2026 | 17.6% | 24.04 |
| 4 Nov 2026 | 17.7% | 24.12 |
| 3 Nov 2026 | 17.7% | 24.19 |
| 2 Nov 2026 | 17.8% | 24.25 |
| 1 Nov 2026 | 17.8% | 24.32 |
| 31 Oct 2026 | 17.9% | 24.39 |
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Primary use | Water supply |
| River basin | Callide Creek Basin |
| Coordinates | 24.355°S, 150.642°E |
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-11.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 24.355°S, 150.642°E · Open in Google Maps
About Callide
As of November 11, 2026, Callide is filled to 17.4% of its total capacity, holding 23.73 hm³ of water out of a maximum 136.4 hm³. At this level the reservoir is critically low.
Over the most recent week on record the fill level has held broadly steady (-0.3 pp), and it is 1.8 points above its level on the same date a year earlier.
Across the readings we hold for Callide — 1095 data points between November 13, 2023 and November 11, 2026 — the level has ranged from a low of 15.6% (May 30, 2024) to a high of 28.0% (March 25, 2026). On average the reservoir is fullest around April and at its lowest around December.
The dam at Callide was completed in 1965. It is operated by BOM primarily for water supply. It lies within the Callide Creek Basin basin at 24.355°S, 150.642°E.