← Queensland

Reservoir · Queensland · Australia · BOM Water Data Online

Callide

18.1% full

Capacity

136.4 hm³

Volume stored

25 hm³

River

Callide Creek

Year completed

1965

Coordinates

24.355°S, 150.642°E

Last updated

2026-10-26

Current fill

18.1%
Critical

vs 7 days ago

-0.3 pp

losing

vs 1 year ago

+2.5 pp

year-over-year

7-day trend

→

stable

Drought context

Storage vs October average

109%of normal

18.1% full on 2026-10-26, against an average of 16.6% for October across 4 years of readings (+1.5 points).

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Callide had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.25). Rain, not storage. Australia drought figures →

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-10-26.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 24.355°S, 150.642°E · Open in Google Maps

About Callide

As of October 26, 2026, Callide is filled to 18.1% of its total capacity, holding 24.7 hm³ of water out of a maximum 136.4 hm³. At this level the reservoir is critically low.

Over the most recent week on record the fill level has held broadly steady (-0.3 pp), and it is 2.5 points above its level on the same date a year earlier.

Across the readings we hold for Callide — 1095 data points between October 28, 2023 and October 26, 2026 — the level has ranged from a low of 15.6% (May 30, 2024) to a high of 28.0% (March 24, 2026). On average the reservoir is fullest around April and at its lowest around December.

The dam at Callide was completed in 1965. It is operated by BOM primarily for water supply. It lies within the Callide Creek Basin basin at 24.355°S, 150.642°E.

Key facts

Current fill level
18.1% of total capacity
Water stored
24.7 hm³
Total capacity
136.4 hm³
7-day change
▼ 0.3 pp
Year-on-year
▲ 2.5 pp
Primary use
Water supply
River
Callide Creek
River basin
Callide Creek Basin
Year completed
1965
Operator
BOM
Coordinates
24.355°S, 150.642°E
Last updated
October 26, 2026

Recent readings

DateFill levelVolume (hm³)
26 Oct 202618.1%24.7
25 Oct 202618.2%24.77
24 Oct 202618.2%24.82
23 Oct 202618.2%24.88
22 Oct 202618.3%24.93
21 Oct 202618.3%24.98
20 Oct 202618.4%25.04
19 Oct 202618.4%25.11
18 Oct 202618.5%25.19
17 Oct 202618.5%25.29
16 Oct 202618.6%25.35
15 Oct 202618.7%25.44

Nearby reservoirs