Nogales
Badajoz · Extremadura · Guadiana
Capacity
18 hm³
Coordinates
38.557°N, 6.730°W
Operator
CHSU
66.7% full
Current fill
66.7%vs 7 days ago
0.0%stable
vs 1 year ago
-5.5%year-over-year
7-day trend
→stable
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 18 hm³ |
| Usable capacity | 16.2 hm³ |
| Primary use | Multi-purpose |
| Operator | CHSU |
| Province | Badajoz |
| Autonomous community | Extremadura |
| River basin | Guadiana |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 38.557, -6.730 · Open in Google Maps
About Nogales
As of September 7, 2026, Nogales is filled to 66.7% of its total capacity, holding roughly 12 hm³ of water out of a maximum 18 hm³. At this level the reservoir is within its normal operating range. Of that total, about 16 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it is 5.5 points below its level on the same date a year earlier.
Across the readings we hold for Nogales — 419 data points between September 4, 2018 and September 7, 2026 — the level has ranged from a low of 60.0% (September 8, 2020) to a high of 100.0% (March 5, 2019). On average the reservoir is fullest around March and at its lowest around October.
It is operated by CHSU primarily for multiple purposes. It lies within the Guadiana basin at 38.557°N, 6.730°W.
Key facts
- Current fill level
- 66.7%
- Water stored
- 12 hm³
- Total capacity
- 18 hm³
- Usable capacity
- 16 hm³
- 7-day change
- No change
- Year-on-year
- ▼ 5.5 pts
- Primary use
- Multipurpose
- River basin
- Guadiana
- Operator
- CHSU
- Coordinates
- 38.557°N, 6.730°W
- Last updated
- September 7, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 7 Sep 2026 | 66.7% | 12 |
| 1 Sep 2026 | 66.7% | 12 |
| 25 Aug 2026 | 66.7% | 12 |
| 18 Aug 2026 | 66.7% | 12 |
| 11 Aug 2026 | 72.2% | 13 |
| 4 Aug 2026 | 72.2% | 13 |
| 28 Jul 2026 | 72.2% | 13 |
| 21 Jul 2026 | 72.2% | 13 |
| 14 Jul 2026 | 72.2% | 13 |
| 7 Jul 2026 | 72.2% | 13 |
| 30 Jun 2026 | 77.8% | 14 |
| 23 Jun 2026 | 77.8% | 14 |

