Villalba de los Barros
Badajoz · Extremadura · Guadiana
Capacity
106 hm³
Coordinates
38.581°N, 6.504°W
Operator
CHSU
90.6% full
Current fill
90.6%vs 7 days ago
0.0%stable
vs 1 year ago
+10.4%year-over-year
7-day trend
→stable
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 106 hm³ |
| Usable capacity | 95.4 hm³ |
| Primary use | Multi-purpose |
| Operator | CHSU |
| Province | Badajoz |
| Autonomous community | Extremadura |
| River basin | Guadiana |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 38.581, -6.504 · Open in Google Maps
About Villalba de los Barros
As of September 7, 2026, Villalba de los Barros is filled to 90.6% of its total capacity, holding roughly 96 hm³ of water out of a maximum 106 hm³. At this level the reservoir is high. Of that total, about 95 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it is 10.4 points above its level on the same date a year earlier.
Across the readings we hold for Villalba de los Barros — 258 data points between October 5, 2021 and September 7, 2026 — the level has ranged from a low of 35.8% (November 8, 2022) to a high of 100.0% (February 10, 2026). On average the reservoir is fullest around April and at its lowest around October.
It is operated by CHSU primarily for multiple purposes. It lies within the Guadiana basin at 38.581°N, 6.504°W.
Key facts
- Current fill level
- 90.6%
- Water stored
- 96 hm³
- Total capacity
- 106 hm³
- Usable capacity
- 95 hm³
- 7-day change
- No change
- Year-on-year
- ▲ 10.4 pts
- Primary use
- Multipurpose
- River basin
- Guadiana
- Operator
- CHSU
- Coordinates
- 38.581°N, 6.504°W
- Last updated
- September 7, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 7 Sep 2026 | 90.6% | 96 |
| 1 Sep 2026 | 90.6% | 96 |
| 25 Aug 2026 | 91.5% | 97 |
| 18 Aug 2026 | 92.5% | 98 |
| 11 Aug 2026 | 92.5% | 98 |
| 4 Aug 2026 | 93.4% | 99 |
| 28 Jul 2026 | 94.3% | 100 |
| 21 Jul 2026 | 95.3% | 101 |
| 14 Jul 2026 | 96.2% | 102 |
| 7 Jul 2026 | 96.2% | 102 |
| 30 Jun 2026 | 97.2% | 103 |
| 23 Jun 2026 | 98.1% | 104 |

