reservoirs.earth logo
Reservoirs.EARTH
Spain
Normal

Corumbel Bajo

Tinto, Odiel y Piedras

Capacity

19 hm³

Coordinates

0.000°N, 0.000°E

Operator

Tinto, Odiel y Piedras

73.7% full

Current fill

73.7%
Normal

vs 7 days ago

-5.2%

losing

vs 1 year ago

-5.2%

year-over-year

7-day trend

falling

Technical specifications

Total capacity19 hm³
Usable capacity19 hm³
Primary use
OperatorTinto, Odiel y Piedras
River basinTinto, Odiel y Piedras
Data source:MITECO·Last reading: 2026-09-01

About Corumbel Bajo

As of September 1, 2026, Corumbel Bajo is filled to 73.7% of its total capacity, holding roughly 14 hm³ of water out of a maximum 19 hm³. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has fallen by 5.2 percentage points, and it is 5.2 points below its level on the same date a year earlier.

Across the readings we hold for Corumbel Bajo — 418 data points between September 4, 2018 and September 1, 2026 — the level has ranged from a low of 5.3% (October 20, 2020) to a high of 100.0% (January 27, 2026). On average the reservoir is fullest around April and at its lowest around November.

It is operated by Tinto, Odiel y Piedras. It lies within the Tinto, Odiel y Piedras basin at 0.000°N, 0.000°E.

Key facts

Current fill level
73.7%
Water stored
14 hm³
Total capacity
19 hm³
7-day change
▼ 5.2 pts
Year-on-year
▼ 5.2 pts
River basin
Tinto, Odiel y Piedras
Operator
Tinto, Odiel y Piedras
Coordinates
0.000°N, 0.000°E
Last updated
September 1, 2026

Recent readings

DateFill levelVolume (hm³)
1 Sep 202673.7%14
25 Aug 202678.9%15
18 Aug 202678.9%15
11 Aug 202678.9%15
4 Aug 202678.9%15
28 Jul 202684.2%16
21 Jul 202684.2%16
14 Jul 202684.2%16
7 Jul 202684.2%16
30 Jun 202689.5%17
23 Jun 202689.5%17
16 Jun 202689.5%17
ShareXLinkedInWhatsApp