Sancho
Tinto, Odiel y Piedras
Capacity
58 hm³
Reported
November 2, 2026
82.8% full
Current fill
82.8%vs 27 Oct 2026
0.0 ppstable
vs 1 year ago
0.0 ppyear-over-year
Trend
→stable
Drought context
Spain drought →Storage vs November average
110%of normal
82.8% now · 75.4% average (9 yrs)
Rainfall, last 3 months
Extremely dry
SPI-3 −2.14 · to 21 Oct 2026
EU drought indicator
Watch
Rainfall deficit · to 11 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3) · Copernicus EDO (CDI).
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 58 hm³ |
| Primary use | — |
| Operator | Tinto, Odiel y Piedras |
| River | Meca Embalse aguas abajo: No Tipo de Presa: Gravedad Año de construcción (Final): 1962 Superficie: 427,00 ha Localización: Ver Mapa |
| River basin | Tinto, Odiel y Piedras |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.473°N, 7.015°W · Open in Google Maps
On the map
Zoom out for the other countries we track · click one to open itLoading map…
About Sancho
As of November 2, 2026, Sancho is filled to 82.8% of its total capacity, holding 48 hm³ of water out of a maximum 58 hm³. At this level the reservoir is high.
Since October 27, 2026 the fill level has held broadly steady (+0.0 pp), and it sits close to where it was a year earlier.
Across the readings we hold for Sancho — 419 data points between October 30, 2018 and November 2, 2026 — the level has ranged from a low of 82.8% (October 30, 2018) to a high of 82.8% (October 30, 2018). On average the reservoir is fullest around January and at its lowest around February.
It is operated by Tinto, Odiel y Piedras. It lies within the Tinto, Odiel y Piedras basin at 37.473°N, 7.015°W.
Key facts
- Current fill level
- 82.8% of total capacity
- Water stored
- 48 hm³
- Total capacity
- 58 hm³
- Change since October 27, 2026
- No change
- Year-on-year
- No change
- River
- Meca Embalse aguas abajo: No Tipo de Presa: Gravedad Año de construcción (Final): 1962 Superficie: 427,00 ha Localización: Ver Mapa
- River basin
- Tinto, Odiel y Piedras
- Operator
- Tinto, Odiel y Piedras
- Coordinates
- 37.473°N, 7.015°W
- Last updated
- November 2, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 2 Nov 2026 | 82.8% | 48 |
| 27 Oct 2026 | 82.8% | 48 |
| 20 Oct 2026 | 82.8% | 48 |
| 13 Oct 2026 | 82.8% | 48 |
| 6 Oct 2026 | 82.8% | 48 |
| 29 Sep 2026 | 82.8% | 48 |
| 22 Sep 2026 | 82.8% | 48 |
| 15 Sep 2026 | 82.8% | 48 |
| 8 Sep 2026 | 82.8% | 48 |
| 1 Sep 2026 | 82.8% | 48 |
| 25 Aug 2026 | 82.8% | 48 |
| 18 Aug 2026 | 82.8% | 48 |

