← Norte
NormalHydroelectric

Guilhofrei

Braga · Norte · Ave

Capacity

21.2 hm³

Reported

November 9, 2026

43.1% full

Current fill

43.1%
Normal

vs 31 Oct 2026

-1.6 pp

losing

vs 1 year ago

N/A

Trend

↓

falling

Drought context

Portugal drought →

Rainfall, last 3 months

Moderately dry

SPI-3 −1.18 · to 21 Oct 2026

EU drought indicator

Warning

Soil-moisture deficit · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3) · Copernicus EDO (CDI).

Recent readings

DateFill levelVolume (hm³)
9 Nov 202643.1%9.1
31 Oct 202644.7%9.5

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

OperatorRH2
Coordinates41.603°N, 8.123°W
Data source:APA / SNIRH — Boletim semanal de albufeiras·Last reading: 2026-11-09

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 41.603°N, 8.123°W · Open in Google Maps

About Guilhofrei

As of November 9, 2026, Guilhofrei is filled to 43.1% of its total capacity, holding 9.1 hm³ of water out of a maximum 21.2 hm³. At this level the reservoir is within its normal operating range.

Since October 31, 2026 the fill level has fallen by 1.6 percentage points.

Across the readings we hold for Guilhofrei — 2 data points between October 31, 2026 and November 9, 2026 — the level has ranged from a low of 43.1% (November 9, 2026) to a high of 44.7% (October 31, 2026).

It is operated by RH2 primarily for hydroelectric power. It lies within the Ave basin at 41.603°N, 8.123°W.

Nearby reservoirs