← Norte
NormalHydroelectric

Vilarinho das Furnas

Braga · Norte · Cávado/Ribeiras Costeiras

Capacity

117.7 hm³

Reported

November 9, 2026

59.9% full

Current fill

59.9%
Normal

vs 31 Oct 2026

-1.2 pp

losing

vs 1 year ago

N/A

Trend

↓

falling

Drought context

Portugal drought →

Rainfall, last 3 months

Moderately dry

SPI-3 −1.18 · to 21 Oct 2026

EU drought indicator

Warning

Soil-moisture deficit · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3) · Copernicus EDO (CDI).

Recent readings

DateFill levelVolume (hm³)
9 Nov 202659.9%70.5
31 Oct 202661.1%71.9

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

OperatorRH2
RiverCávado
Coordinates41.748°N, 8.023°W
Data source:APA / SNIRH — Boletim semanal de albufeiras·Last reading: 2026-11-09

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 41.748°N, 8.023°W · Open in Google Maps

About Vilarinho das Furnas

As of November 9, 2026, Vilarinho das Furnas is filled to 59.9% of its total capacity, holding 70.5 hm³ of water out of a maximum 117.7 hm³. At this level the reservoir is within its normal operating range.

Since October 31, 2026 the fill level has fallen by 1.2 percentage points.

Across the readings we hold for Vilarinho das Furnas — 2 data points between October 31, 2026 and November 9, 2026 — the level has ranged from a low of 59.9% (November 9, 2026) to a high of 61.1% (October 31, 2026).

It is operated by RH2 primarily for hydroelectric power. It lies within the Cávado/Ribeiras Costeiras basin at 41.748°N, 8.023°W.

Nearby reservoirs