Touvedo
Viana do Castelo · Norte · Lima
Capacity
11.7 hm³
Coordinates
41.703°N, 8.253°W
Operator
RH1
88.1% full
Current fill
88.1%vs 7 days ago
0.0%stable
vs 1 year ago
N/A7-day trend
→stable
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 11.7 hm³ |
| Usable capacity | 10.5 hm³ |
| Primary use | Multi-purpose |
| Operator | RH1 |
| River | Lima |
| Province | Viana do Castelo |
| Autonomous community | Norte |
| River basin | Lima |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 41.703, -8.253 · Open in Google Maps
About Touvedo
As of September 8, 2026, Touvedo is filled to 88.1% of its total capacity, holding roughly 10 hm³ of water out of a maximum 12 hm³. At this level the reservoir is high. Of that total, about 11 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts).
Across the readings we hold for Touvedo — 1 data points between September 8, 2026 and September 8, 2026 — the level has ranged from a low of 88.1% (September 8, 2026) to a high of 88.1% (September 8, 2026).
It is operated by RH1 primarily for multiple purposes. It lies within the Lima basin at 41.703°N, 8.253°W.
Key facts
- Current fill level
- 88.1%
- Water stored
- 10 hm³
- Total capacity
- 12 hm³
- Usable capacity
- 11 hm³
- 7-day change
- No change
- Primary use
- Multipurpose
- River
- Lima
- River basin
- Lima
- Operator
- RH1
- Coordinates
- 41.703°N, 8.253°W
- Last updated
- September 8, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 8 Sep 2026 | 88.1% | 10 |

