Reservoir · Karnataka · India · AP-WRIMS
Tungabhadra
Tungabhadra Dam
28.3% of live capacity
Gross capacity
105.8 TMC (2,996 MCM)
Live capacity
103.6 TMC (2,933 MCM)
River
Tungabhadra
Basin
Krishna
Primary use
irrigation
Reported
November 13, 2026
Capacity in TMC
Tungabhadra Dam has a gross capacity of 105.8 TMC (2,996 MCM), of which 103.6 TMC (2,933 MCM) is live storage; it is currently at 28.3% of live capacity, holding 29.3 TMC (828.804 MCM).
- Gross capacity
- 105.8 TMC (2,996 MCM)
- Live capacity
- 103.6 TMC (2,933 MCM)
- Current storage
- 29.3 TMC (828.804 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
28.3%vs 5 Nov 2026
-6.2 pplosing
vs 1 year ago
N/ATrend
↓falling
Drought context
India drought →Rainfall, last 3 months
Extremely dry
SPI-3 −3.06 · to 21 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 13 Nov 2026 | 28.3% | 828.804 |
| 12 Nov 2026 | 29.0% | 850.467 |
| 11 Nov 2026 | 29.8% | 872.78 |
| 10 Nov 2026 | 30.5% | 895.83 |
| 5 Nov 2026 | 34.5% | 1,012 |
| 4 Nov 2026 | 35.3% | 1,035 |
| 3 Nov 2026 | 36.0% | 1,057 |
| 2 Nov 2026 | 36.8% | 1,080 |
| 29 Oct 2026 | 39.9% | 1,171 |
| 28 Oct 2026 | 40.7% | 1,194 |
| 27 Oct 2026 | 41.5% | 1,219 |
| 22 Oct 2026 | 46.5% | 1,364 |
Weekly storage
Fill history — multi-year
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Operator | KA/AP |
| Coordinates | 15.258°N, 76.325°E |
About this reservoir
Data source
official
Storage data: AP-WRIMS.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 15.258°N, 76.325°E · Open in Google Maps
About Tungabhadra Dam
As of November 13, 2026, Tungabhadra Dam is at 28.3% of useful capacity, holding 29.3 TMC (828.804 MCM) of 103.6 TMC (2,933 MCM). Of the gross 105.8 TMC (2,996 MCM), that is 27.7%. At this level the reservoir is low.
Since November 5, 2026 the fill level has fallen by 6.2 percentage points.
Across the readings we hold for Tungabhadra Dam — 37 data points between June 25, 2026 and November 13, 2026 — the level has ranged from a low of 3.3% (July 2, 2026) to a high of 90.2% (September 2, 2026). On average the reservoir is fullest around September and at its lowest around June.
It is operated by KA/AP primarily for irrigation. It lies within the Krishna basin at 15.258°N, 76.325°E.

