← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Jeedipalli Reservoir

95.5% of gross capacity

Gross capacity

1.7 TMC (47.601 MCM)

Live capacity

1.6 TMC (45.335 MCM)

Basin

Pennar

Reported

November 11, 2026

Capacity in TMC

Jeedipalli Reservoir has a gross capacity of 1.7 TMC (47.601 MCM), of which 1.6 TMC (45.335 MCM) is live storage; it is currently at 95.5% of gross capacity, holding 1.6 TMC (45.477 MCM) (100.3% of live capacity).

Gross capacity
1.7 TMC (47.601 MCM)
Live capacity
1.6 TMC (45.335 MCM)
Current storage
1.6 TMC (45.477 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

95.5%
High

vs 7 days ago

-3.5 pp

losing

vs 1 year ago

N/A

7-day trend

↓

falling

Drought context

India drought →

Rainfall, last 3 months

Extremely dry

SPI-3 −2.40 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
11 Nov 202695.5%45.477
10 Nov 202695.8%45.618
8 Nov 202698.0%46.638
5 Nov 202698.8%47.034
4 Nov 202699.0%47.119
3 Nov 202698.6%46.949
2 Nov 202699.8%47.516
29 Oct 2026100.0%47.601
28 Oct 2026100.0%47.601
27 Oct 2026100.0%48
22 Oct 202689.9%43
16 Sep 2026100.0%48

Weekly storage

Fill history — multi-year

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

OperatorAP Water Resources Dept
Coordinates14.699°N, 77.270°E

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 14.699°N, 77.270°E · Open in Google Maps

About Jeedipalli Reservoir

As of November 11, 2026, Jeedipalli Reservoir is filled to 95.5% of its gross capacity, holding 1.6 TMC (45.477 MCM) of a gross 1.7 TMC (47.601 MCM). At this level the reservoir is high. Of that total, 1.6 TMC (45.335 MCM) is live storage.

Over the most recent week on record the fill level has fallen by 3.5 percentage points.

Across the readings we hold for Jeedipalli Reservoir — 22 data points between July 2, 2026 and November 11, 2026 — the level has ranged from a low of 19.6% (August 4, 2026) to a high of 100.0% (August 27, 2026).

It is operated by AP Water Resources Dept. It lies within the Pennar basin at 14.699°N, 77.270°E.