← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Chagallu Balancing Reservoir

45.7% of gross capacity

Gross capacity

0.95 TMC (27 MCM)

Live capacity

0.88 TMC (25 MCM)

Basin

Pennar

Operator

AP Water Resources Dept

Coordinates

14.918°N, 77.828°E

Last updated

2026-10-27

Capacity in TMC

Chagallu Balancing Reservoir has a gross capacity of 0.95 TMC (27 MCM), of which 0.88 TMC (25 MCM) is live storage; it is currently at 45.7% of gross capacity, holding 0.42 TMC (12 MCM) (48.0% of live capacity).

Gross capacity
0.95 TMC (27 MCM)
Live capacity
0.88 TMC (25 MCM)
Current storage
0.42 TMC (12 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

45.7%
Normal

vs 22 Oct 2026

-0.7 pp

losing

vs 1 year ago

N/A

Trend

→

stable

Drought context

Rain over the last three months · 11 October 2026

Extremely dry

In the three months to 11 October 2026 the area around Chagallu Balancing Reservoir had extremely little rain for the season, a shortfall seen about one year in forty. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −2.48). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 14.918°N, 77.828°E · Open in Google Maps

About Chagallu Balancing Reservoir

As of October 27, 2026, Chagallu Balancing Reservoir is filled to 45.7% of its gross capacity, holding 0.42 TMC (12 MCM) of a gross 0.95 TMC (27 MCM). At this level the reservoir is within its normal operating range. Of that total, 0.88 TMC (25 MCM) is live storage.

Since October 22, 2026 the fill level has held broadly steady (-0.7 pp).

Across the readings we hold for Chagallu Balancing Reservoir — 13 data points between July 2, 2026 and October 27, 2026 — the level has ranged from a low of 43.5% (September 16, 2026) to a high of 54.5% (July 2, 2026).

It is operated by AP Water Resources Dept. It lies within the Pennar basin at 14.918°N, 77.828°E.

Key facts

Current fill level
45.7% of total capacity
Water stored
0.42 TMC (12 MCM)
Total capacity
0.95 TMC (27 MCM)
Usable capacity
0.88 TMC (25 MCM)
Change since October 22, 2026
▼ 0.7 pp
River basin
Pennar
Operator
AP Water Resources Dept
Coordinates
14.918°N, 77.828°E
Last updated
October 27, 2026

Recent readings

DateFill levelVolume (hm³)
27 Oct 202645.7%12
22 Oct 202646.4%12
16 Sep 202643.5%12
9 Sep 202644.5%12
2 Sep 202645.5%12
27 Aug 202646.3%12
20 Aug 202647.2%13
13 Aug 202648.2%13
4 Aug 202649.4%13
29 Jul 202650.3%14
22 Jul 202651.2%14
15 Jul 202652.1%14

Nearby reservoirs