reservoirs.earth logo
Reservoirs.EARTH
← Andhra Pradesh

Reservoir · Andhra Pradesh · India · CWC

Thimmapuram Sr1

66.7% full

Gross capacity

0.28 TMC (8 MCM)

Live capacity

0.21 TMC (6 MCM)

River

Pennar

Basin

Pennar

Operator

AP Water Resources Dept

Coordinates

14.751°N, 78.140°E

Last updated

2026-10-11

Capacity in TMC

Thimmapuram Sr1 Dam has a gross capacity of 0.28 TMC (8 MCM), of which 0.21 TMC (6 MCM) is live storage; it is currently at 67% full, holding 0.21 TMC (6 MCM).

Gross capacity
0.28 TMC (8 MCM)
Live capacity
0.21 TMC (6 MCM)
Current storage
0.21 TMC (6 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.

Current fill

66.7%
Normal

vs 7 days ago

0.0%

stable

vs 1 year ago

N/A

7-day trend

→

stable

Drought context

Rain over the last three months · 21 September 2026

Severely dry

In the three months to 21 September 2026 the area around Thimmapuram Sr1 had far less rain than normal, a shortfall seen about one year in fifteen. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −1.85). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 14.751, 78.140 · Open in Google Maps

About Thimmapuram Sr1

As of October 11, 2026, Thimmapuram Sr1 is filled to 66.7% of its total capacity, holding 0.21 TMC (6 MCM) of a gross 0.28 TMC (8 MCM). At this level the reservoir is within its normal operating range. Of that total, 0.21 TMC (6 MCM) is live storage.

Over the most recent week on record the fill level has held broadly steady (+0.0 pts).

Across the readings we hold for Thimmapuram Sr1 — 1 data points between October 11, 2026 and October 11, 2026 — the level has ranged from a low of 66.7% (October 11, 2026) to a high of 66.7% (October 11, 2026).

It is operated by AP Water Resources Dept. It lies within the Pennar basin at 14.751°N, 78.140°E.

Key facts

Current fill level
66.7%
Water stored
0.21 TMC (6 MCM)
Total capacity
0.28 TMC (8 MCM)
Usable capacity
0.21 TMC (6 MCM)
7-day change
No change
River
Pennar
River basin
Pennar
Operator
AP Water Resources Dept
Coordinates
14.751°N, 78.140°E
Last updated
October 11, 2026

Recent readings

DateFill levelVolume (hm³)
11 Oct 202666.7%6

Nearby reservoirs

ShareXLinkedInWhatsApp