← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Bhairavanithippa Project

9.0% of gross capacity

Gross capacity

2.0 TMC (56.634 MCM)

Live capacity

2.0 TMC (55.501 MCM)

Basin

Krishna

Reported

November 10, 2026

Capacity in TMC

Bhairavanithippa Project Dam has a gross capacity of 2.0 TMC (56.634 MCM), of which 2.0 TMC (55.501 MCM) is live storage; it is currently at 9% of gross capacity, holding 0.18 TMC (5.097 MCM) (9.2% of live capacity).

Gross capacity
2.0 TMC (56.634 MCM)
Live capacity
2.0 TMC (55.501 MCM)
Current storage
0.18 TMC (5.097 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

9.0%
Critical

vs 7 days ago

-0.5 pp

losing

vs 1 year ago

N/A

7-day trend

→

stable

Drought context

India drought →

Rainfall, last 3 months

Extremely dry

SPI-3 −2.57 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
10 Nov 20269.0%5.097
8 Nov 20269.5%5.38
5 Nov 20269.5%5.38
4 Nov 20269.5%5.38
3 Nov 20269.5%5.38
2 Nov 20269.5%5.38
29 Oct 20269.5%5.38
28 Oct 20269.5%5.38
27 Oct 20269.5%5
22 Oct 20269.5%5
16 Sep 202610.0%6
9 Sep 202610.5%6

Weekly storage

Fill history — multi-year

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

OperatorAP Water Resources Dept
Coordinates14.539°N, 76.838°E

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 14.539°N, 76.838°E · Open in Google Maps

About Bhairavanithippa Project

As of November 10, 2026, Bhairavanithippa Project is filled to 9.0% of its gross capacity, holding 0.18 TMC (5.097 MCM) of a gross 2.0 TMC (56.634 MCM). At this level the reservoir is critically low. Of that total, 2.0 TMC (55.501 MCM) is live storage.

Over the most recent week on record the fill level has held broadly steady (-0.5 pp).

Across the readings we hold for Bhairavanithippa Project — 21 data points between July 2, 2026 and November 10, 2026 — the level has ranged from a low of 9.0% (November 10, 2026) to a high of 11.6% (July 29, 2026).

It is operated by AP Water Resources Dept. It lies within the Krishna basin at 14.539°N, 76.838°E.

Nearby reservoirs