Mopadu Reservoir Project

Gross capacity

2.1 TMC (59 MCM)

Live capacity

2.0 TMC (58 MCM)

Basin

Other

Operator

AP Water Resources Dept

Coordinates

15.106°N, 79.482°E

Last updated

2026-10-14

Capacity in TMC

Mopadu Reservoir Project has a gross capacity of 2.1 TMC (59 MCM), of which 2.0 TMC (58 MCM) is live storage.

Gross capacity
2.1 TMC (59 MCM)
Live capacity
2.0 TMC (58 MCM)
Current storage
0.00 TMC (0 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.

Current fill

0.0%
Critical

vs 7 days ago

0.0%

stable

vs 1 year ago

N/A

7-day trend

→

stable

Drought context

Rain over the last three months · 21 September 2026

Moderately dry

In the three months to 21 September 2026 the area around Mopadu Reservoir Project had well below normal rain, a shortfall seen about one year in six. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −1.49). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 15.106, 79.482 · Open in Google Maps

About Mopadu Reservoir Project

As of October 14, 2026, Mopadu Reservoir Project is filled to 0.0% of its total capacity, holding 0.00 TMC (0 MCM) of a gross 2.1 TMC (59 MCM). At this level the reservoir is critically low. Of that total, 2.0 TMC (58 MCM) is live storage.

Over the most recent week on record the fill level has held broadly steady (+0.0 pts).

Across the readings we hold for Mopadu Reservoir Project — 1 data points between October 14, 2026 and October 14, 2026 — the level has ranged from a low of 0.0% (October 14, 2026) to a high of 0.0% (October 14, 2026).

It is operated by AP Water Resources Dept. It lies within the Other basin at 15.106°N, 79.482°E.

Key facts

Current fill level
0.0%
Water stored
0.00 TMC (0 MCM)
Total capacity
2.1 TMC (59 MCM)
Usable capacity
2.0 TMC (58 MCM)
7-day change
No change
River basin
Other
Operator
AP Water Resources Dept
Coordinates
15.106°N, 79.482°E
Last updated
October 14, 2026

Recent readings

DateFill levelVolume (hm³)
14 Oct 20260.0%0

Nearby reservoirs

ShareXLinkedInWhatsApp