← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Badvel Tank

14.7% of gross capacity

Gross capacity

1.4 TMC (38.511 MCM)

Live capacity

1.4 TMC (38.511 MCM)

Basin

Pennar

Operator

AP Water Resources Dept

Coordinates

14.783°N, 79.075°E

Last updated

2026-10-29

Capacity in TMC

Badvel Tank Dam has a gross capacity of 1.4 TMC (38.511 MCM); it is currently at 14.7% of gross capacity, holding 0.20 TMC (5.663 MCM).

Gross capacity
1.4 TMC (38.511 MCM)
Live capacity
1.4 TMC (38.511 MCM)
Current storage
0.20 TMC (5.663 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

14.7%
Critical

vs 7 days ago

-18.4 pp

losing

vs 1 year ago

N/A

7-day trend

↓

falling

Drought context

Rain over the last three months · 11 October 2026

Severely dry

In the three months to 11 October 2026 the area around Badvel Tank had far less rain than normal, a shortfall seen about one year in fifteen. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −1.69). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 14.783°N, 79.075°E · Open in Google Maps

About Badvel Tank

As of October 29, 2026, Badvel Tank is filled to 14.7% of its gross capacity, holding 0.20 TMC (5.663 MCM) of a gross 1.4 TMC (38.511 MCM). At this level the reservoir is critically low.

Over the most recent week on record the fill level has fallen by 18.4 percentage points.

Across the readings we hold for Badvel Tank — 15 data points between July 1, 2026 and October 29, 2026 — the level has ranged from a low of 14.7% (October 28, 2026) to a high of 66.2% (July 22, 2026).

It is operated by AP Water Resources Dept. It lies within the Pennar basin at 14.783°N, 79.075°E.

Key facts

Current fill level
14.7% of total capacity
Water stored
0.20 TMC (5.663 MCM)
Total capacity
1.4 TMC (38.511 MCM)
7-day change
▼ 18.4 pp
River basin
Pennar
Operator
AP Water Resources Dept
Coordinates
14.783°N, 79.075°E
Last updated
October 29, 2026

Recent readings

DateFill levelVolume (hm³)
29 Oct 202614.7%5.663
28 Oct 202614.7%5.663
27 Oct 202625.7%10
22 Oct 202633.1%13
16 Sep 202647.8%18
9 Sep 202655.1%21
2 Sep 202666.2%25
27 Aug 202666.2%25
20 Aug 202666.2%25
13 Aug 202666.2%25
4 Aug 202666.2%25
29 Jul 202666.2%25

Nearby reservoirs