← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Gandipalem Reservoir Project

12.0% of live capacity

Gross capacity

1.9 TMC (53 MCM)

Live capacity

1.7 TMC (48 MCM)

Basin

Other

Operator

AP Water Resources Dept

Coordinates

14.991°N, 79.298°E

Last updated

2026-10-27

Capacity in TMC

Gandipalem Reservoir Project has a gross capacity of 1.9 TMC (53 MCM), of which 1.7 TMC (48 MCM) is live storage; it is currently at 12% of live capacity, holding 0.21 TMC (6 MCM).

Gross capacity
1.9 TMC (53 MCM)
Live capacity
1.7 TMC (48 MCM)
Current storage
0.21 TMC (6 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

12.0%
Critical

vs 22 Oct 2026

-0.1 pp

losing

vs 1 year ago

N/A

Trend

→

stable

Drought context

Rain over the last three months · 11 October 2026

Moderately dry

In the three months to 11 October 2026 the area around Gandipalem Reservoir Project had well below normal rain, a shortfall seen about one year in six. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −1.48). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 14.991°N, 79.298°E · Open in Google Maps

About Gandipalem Reservoir Project

As of October 27, 2026, Gandipalem Reservoir Project is at 12.0% of useful capacity, holding 0.21 TMC (6 MCM) of 1.7 TMC (48 MCM). Of the gross 1.9 TMC (53 MCM), that is 11.3%. At this level the reservoir is critically low.

Since October 22, 2026 the fill level has held broadly steady (-0.1 pp).

Across the readings we hold for Gandipalem Reservoir Project — 13 data points between July 2, 2026 and October 27, 2026 — the level has ranged from a low of 12.0% (October 27, 2026) to a high of 15.9% (July 2, 2026).

It is operated by AP Water Resources Dept. It lies within the Other basin at 14.991°N, 79.298°E.

Key facts

Current fill level
12.0% of useful capacity
Water stored
0.21 TMC (6 MCM)
Total capacity
1.9 TMC (53 MCM)
Usable capacity
1.7 TMC (48 MCM)
Change since October 22, 2026
▼ 0.1 pp
River basin
Other
Operator
AP Water Resources Dept
Coordinates
14.991°N, 79.298°E
Last updated
October 27, 2026

Recent readings

DateFill levelVolume (hm³)
27 Oct 202612.0%6
22 Oct 202612.0%6
16 Sep 202612.9%7
9 Sep 202613.2%7
2 Sep 202613.5%7
27 Aug 202613.7%7
20 Aug 202614.1%8
13 Aug 202614.4%8
4 Aug 202614.9%8
29 Jul 202615.1%8
22 Jul 202615.4%8
15 Jul 202615.4%8

Nearby reservoirs