reservoirs.earth logo
Reservoirs.EARTH
Karnataka

Reservoir · Karnataka · India · CWC · SOUTHERN region

Karanja Dam

57.7% full

Gross capacity

7.7 TMC (218 MCM)

Live capacity

7.3 TMC (207 MCM)

River

Karanja

Basin

Godavari

Primary use

irrigation

Operator

KA

Coordinates

17.888°N, 77.313°E

Last updated

2026-09-10

Capacity in TMC

Karanja Dam has a gross capacity of 7.7 TMC (218 MCM), of which 7.3 TMC (207 MCM) is live storage; it is currently at 58% full, holding 4.2 TMC (120 MCM).

Gross capacity
7.7 TMC (218 MCM)
Live capacity
7.3 TMC (207 MCM)
Current storage
4.2 TMC (120 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.

Current fill

57.7%
Normal

vs 7 days ago

-2.5%

losing

vs 1 year ago

N/A

7-day trend

falling

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: SOUTHERN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 17.888, 77.313 · Open in Google Maps

About Karanja Dam

As of September 10, 2026, Karanja Dam is filled to 57.7% of its total capacity, holding 4.2 TMC (120 MCM) of a gross 7.7 TMC (218 MCM). At this level the reservoir is within its normal operating range. Of that total, 7.3 TMC (207 MCM) is live storage.

Over the most recent week on record the fill level has fallen by 2.5 percentage points.

Across the readings we hold for Karanja Dam — 9 data points between July 16, 2026 and September 10, 2026 — the level has ranged from a low of 57.7% (September 10, 2026) to a high of 62.6% (August 13, 2026).

It is operated by KA primarily for irrigation. It lies within the Godavari basin at 17.888°N, 77.313°E.

Key facts

Current fill level
57.7%
Water stored
4.2 TMC (120 MCM)
Total capacity
7.7 TMC (218 MCM)
Usable capacity
7.3 TMC (207 MCM)
7-day change
▼ 2.5 pts
Primary use
Irrigation
River
Karanja
River basin
Godavari
Operator
KA
Coordinates
17.888°N, 77.313°E
Last updated
September 10, 2026

Recent readings

DateFill levelVolume (hm³)
10 Sep 202657.7%120
3 Sep 202660.2%125
27 Aug 202661.9%129
20 Aug 202662.2%129
13 Aug 202662.5%130
6 Aug 202661.6%128
30 Jul 202660.6%126
23 Jul 202660.6%126
16 Jul 202661.4%128

Nearby reservoirs

ShareXLinkedInWhatsApp