← Karnataka

Reservoir · Karnataka · India · CWC · SOUTHERN region

Karanja Dam

55.4% of live capacity

Gross capacity

7.7 TMC (218 MCM)

Live capacity

7.3 TMC (207 MCM)

River

Karanja

Basin

Godavari

Primary use

irrigation

Operator

KA

Coordinates

17.888°N, 77.313°E

Last updated

2026-10-22

Capacity in TMC

Karanja Dam has a gross capacity of 7.7 TMC (218 MCM), of which 7.3 TMC (207 MCM) is live storage; it is currently at 55.4% of live capacity, holding 4.1 TMC (115 MCM).

Gross capacity
7.7 TMC (218 MCM)
Live capacity
7.3 TMC (207 MCM)
Current storage
4.1 TMC (115 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

55.4%
Normal

vs 7 days ago

-1.7 pp

losing

vs 1 year ago

N/A

7-day trend

↓

falling

Drought context

Rain over the last three months · 11 October 2026

Moderately dry

In the three months to 11 October 2026 the area around Karanja Dam had well below normal rain, a shortfall seen about one year in six. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −1.18). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC. CWC region: SOUTHERN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 17.888°N, 77.313°E · Open in Google Maps

About Karanja Dam

As of October 22, 2026, Karanja Dam is at 55.4% of useful capacity, holding 4.1 TMC (115 MCM) of 7.3 TMC (207 MCM). Of the gross 7.7 TMC (218 MCM), that is 52.8%. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has fallen by 1.7 percentage points.

Across the readings we hold for Karanja Dam — 15 data points between July 16, 2026 and October 22, 2026 — the level has ranged from a low of 55.4% (October 22, 2026) to a high of 62.6% (August 13, 2026).

It is operated by KA primarily for irrigation. It lies within the Godavari basin at 17.888°N, 77.313°E.

Key facts

Current fill level
55.4% of useful capacity
Water stored
4.1 TMC (115 MCM)
Total capacity
7.7 TMC (218 MCM)
Usable capacity
7.3 TMC (207 MCM)
7-day change
▼ 1.7 pp
Primary use
Irrigation
River
Karanja
River basin
Godavari
Operator
KA
Coordinates
17.888°N, 77.313°E
Last updated
October 22, 2026

Recent readings

DateFill levelVolume (hm³)
22 Oct 202655.4%115
15 Oct 202657.1%119
8 Oct 202657.2%119
1 Oct 202657.4%119
24 Sep 202657.5%119
17 Sep 202657.7%120
10 Sep 202657.7%120
3 Sep 202660.2%125
27 Aug 202661.9%129
20 Aug 202662.2%129
13 Aug 202662.5%130
6 Aug 202661.6%128

Nearby reservoirs