Reservoir · Karnataka · India · CWC · SOUTHERN region
Karanja Dam
54.2% of live capacity
Gross capacity
7.7 TMC (218 MCM)
Live capacity
7.3 TMC (207 MCM)
River
Karanja
Basin
Godavari
Primary use
irrigation
Reported
October 29, 2026
Capacity in TMC
Karanja Dam has a gross capacity of 7.7 TMC (218 MCM), of which 7.3 TMC (207 MCM) is live storage; it is currently at 54.2% of live capacity, holding 4.0 TMC (113 MCM).
- Gross capacity
- 7.7 TMC (218 MCM)
- Live capacity
- 7.3 TMC (207 MCM)
- Current storage
- 4.0 TMC (113 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
54.2%vs 7 days ago
-1.2 pplosing
vs 1 year ago
N/A7-day trend
↓falling
Drought context
India drought →Rainfall, last 3 months
Extremely dry
SPI-3 −2.88 · to 21 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: CWC. CWC region: SOUTHERN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 17.888°N, 77.313°E · Open in Google Maps
On the map
Zoom out for the other countries we track · click one to open itLoading map…
About Karanja Dam
As of October 29, 2026, Karanja Dam is at 54.2% of useful capacity, holding 4.0 TMC (113 MCM) of 7.3 TMC (207 MCM). Of the gross 7.7 TMC (218 MCM), that is 51.8%. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has fallen by 1.2 percentage points.
Across the readings we hold for Karanja Dam — 16 data points between July 16, 2026 and October 29, 2026 — the level has ranged from a low of 54.2% (October 29, 2026) to a high of 62.6% (August 13, 2026).
It is operated by KA primarily for irrigation. It lies within the Godavari basin at 17.888°N, 77.313°E.
Key facts
- Current fill level
- 54.2% of useful capacity
- Water stored
- 4.0 TMC (113 MCM)
- Total capacity
- 7.7 TMC (218 MCM)
- Usable capacity
- 7.3 TMC (207 MCM)
- 7-day change
- ▼ 1.2 pp
- Primary use
- Irrigation
- River
- Karanja
- River basin
- Godavari
- Operator
- KA
- Coordinates
- 17.888°N, 77.313°E
- Last updated
- October 29, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 29 Oct 2026 | 54.2% | 113 |
| 22 Oct 2026 | 55.4% | 115 |
| 15 Oct 2026 | 57.1% | 119 |
| 8 Oct 2026 | 57.2% | 119 |
| 1 Oct 2026 | 57.4% | 119 |
| 24 Sep 2026 | 57.5% | 119 |
| 17 Sep 2026 | 57.7% | 120 |
| 10 Sep 2026 | 57.7% | 120 |
| 3 Sep 2026 | 60.2% | 125 |
| 27 Aug 2026 | 61.9% | 129 |
| 20 Aug 2026 | 62.2% | 129 |
| 13 Aug 2026 | 62.5% | 130 |

