← Karnataka

Reservoir · Karnataka · India · CWC · SOUTHERN region

Karanja Dam

54.2% of live capacity

Gross capacity

7.7 TMC (218 MCM)

Live capacity

7.3 TMC (207 MCM)

River

Karanja

Basin

Godavari

Primary use

irrigation

Reported

October 29, 2026

Capacity in TMC

Karanja Dam has a gross capacity of 7.7 TMC (218 MCM), of which 7.3 TMC (207 MCM) is live storage; it is currently at 54.2% of live capacity, holding 4.0 TMC (113 MCM).

Gross capacity
7.7 TMC (218 MCM)
Live capacity
7.3 TMC (207 MCM)
Current storage
4.0 TMC (113 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

54.2%
Normal

vs 7 days ago

-1.2 pp

losing

vs 1 year ago

N/A

7-day trend

↓

falling

Drought context

India drought →

Rainfall, last 3 months

Extremely dry

SPI-3 −2.88 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC. CWC region: SOUTHERN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 17.888°N, 77.313°E · Open in Google Maps

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

About Karanja Dam

As of October 29, 2026, Karanja Dam is at 54.2% of useful capacity, holding 4.0 TMC (113 MCM) of 7.3 TMC (207 MCM). Of the gross 7.7 TMC (218 MCM), that is 51.8%. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has fallen by 1.2 percentage points.

Across the readings we hold for Karanja Dam — 16 data points between July 16, 2026 and October 29, 2026 — the level has ranged from a low of 54.2% (October 29, 2026) to a high of 62.6% (August 13, 2026).

It is operated by KA primarily for irrigation. It lies within the Godavari basin at 17.888°N, 77.313°E.

Key facts

Current fill level
54.2% of useful capacity
Water stored
4.0 TMC (113 MCM)
Total capacity
7.7 TMC (218 MCM)
Usable capacity
7.3 TMC (207 MCM)
7-day change
▼ 1.2 pp
Primary use
Irrigation
River
Karanja
River basin
Godavari
Operator
KA
Coordinates
17.888°N, 77.313°E
Last updated
October 29, 2026

Recent readings

DateFill levelVolume (hm³)
29 Oct 202654.2%113
22 Oct 202655.4%115
15 Oct 202657.1%119
8 Oct 202657.2%119
1 Oct 202657.4%119
24 Sep 202657.5%119
17 Sep 202657.7%120
10 Sep 202657.7%120
3 Sep 202660.2%125
27 Aug 202661.9%129
20 Aug 202662.2%129
13 Aug 202662.5%130

Nearby reservoirs