← Telangana

Reservoir · Telangana · India · Telangana I&CAD

Kaddam

Kaddam Project Dam

50.9% of gross capacity

Gross capacity

38.5 TMC (1,090 MCM)

Live capacity

35.0 TMC (992 MCM)

River

Kaddam

Basin

Godavari

Primary use

irrigation

Operator

TS

Coordinates

18.983°N, 78.533°E

Last updated

2026-10-28

Capacity in TMC

Kaddam Dam has a gross capacity of 38.5 TMC (1,090 MCM), of which 35.0 TMC (992 MCM) is live storage; it is currently at 50.9% of gross capacity, holding 19.6 TMC (554 MCM) (55.8% of live capacity).

Gross capacity
38.5 TMC (1,090 MCM)
Live capacity
35.0 TMC (992 MCM)
Current storage
19.6 TMC (554 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from Telangana I&CAD, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

50.9%
Normal

vs 22 Oct 2026

-3.3 pp

losing

vs 1 year ago

N/A

Trend

↓

falling

Drought context

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Kaddam had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.45). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: Telangana I&CAD.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 18.983°N, 78.533°E · Open in Google Maps

About Kaddam Project Dam

As of October 28, 2026, Kaddam Project Dam is filled to 50.9% of its gross capacity, holding 19.6 TMC (554 MCM) of a gross 38.5 TMC (1,090 MCM). At this level the reservoir is within its normal operating range. Of that total, 35.0 TMC (992 MCM) is live storage.

Since October 22, 2026 the fill level has fallen by 3.3 percentage points.

Across the readings we hold for Kaddam Project Dam — 24 data points between June 25, 2026 and October 28, 2026 — the level has ranged from a low of 7.8% (June 25, 2026) to a high of 74.5% (August 14, 2026).

It is operated by TS primarily for irrigation. It lies within the Godavari basin at 18.983°N, 78.533°E.

Key facts

Current fill level
50.9% of total capacity
Water stored
19.6 TMC (554 MCM)
Total capacity
38.5 TMC (1,090 MCM)
Usable capacity
35.0 TMC (992 MCM)
Change since October 22, 2026
▼ 3.3 pp
Primary use
Irrigation
River
Kaddam
River basin
Godavari
Operator
TS
Coordinates
18.983°N, 78.533°E
Last updated
October 28, 2026

Recent readings

DateFill levelVolume (hm³)
28 Oct 202650.9%554
23 Oct 202654.7%596
22 Oct 202654.1%74
15 Oct 202661.4%84
8 Oct 202669.1%95
1 Oct 202672.2%99
24 Sep 202672.2%99
17 Sep 202671.7%782
10 Sep 202670.8%97
3 Sep 202672.0%99
28 Aug 202674.5%812
27 Aug 202672.2%99

Nearby reservoirs