← GRANDE
HighHydroelectric

P. COLOMBIA

Minas Gerais · GRANDE

Useful capacity

221.99 hm³

Reported

November 10, 2026

87.2% of useful capacity

Current fill

87.2%

of useful capacity

High

vs 7 days ago

+3.0 pp

gaining

vs 1 year ago

+21.6 pp

year-over-year

7-day trend

↑

rising

Drought context

Brazil drought →

Storage vs November average

126%of normal

87.2% now · 69.0% average (2 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.33 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
10 Nov 202687.2%193.6
9 Nov 202683.0%184.2
8 Nov 202687.8%194.9
7 Nov 202684.8%188.2
6 Nov 202680.0%177.5
5 Nov 202678.2%173.5
4 Nov 202689.6%199
3 Nov 202684.2%186.9
2 Nov 202678.8%174.9
1 Nov 202677.0%170.9
31 Oct 202675.2%166.9
30 Oct 202678.2%173.5

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity221.99 hm³
OperatorONS
Coordinates20.127°S, 48.566°W
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-11-10

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 20.127°S, 48.566°W · Open in Google Maps

About P. COLOMBIA

As of November 10, 2026, P. COLOMBIA is at 87.2% of useful capacity, holding 193.6 hm³ of 221.99 hm³. Of the 1,513 hm³ total capacity, that is 12.8%. At this level the reservoir is high.

Over the most recent week on record the fill level has risen by 3.0 percentage points, and it is 21.6 points above its level on the same date a year earlier.

Across the readings we hold for P. COLOMBIA — 65 data points between November 10, 2025 and November 10, 2026 — the level has ranged from a low of 42.6% (December 31, 2025) to a high of 90.8% (May 15, 2026). On average the reservoir is fullest around March and at its lowest around December.

It is operated by ONS primarily for hydroelectric power. It lies within the GRANDE basin at 20.127°S, 48.566°W.