← GRANDE
NormalHydroelectric

JAGUARA

Minas Gerais · GRANDE

Useful capacity

96.76 hm³

Reported

November 15, 2026

69.8% of useful capacity

Current fill

69.8%

of useful capacity

Normal

vs 7 days ago

-11.2 pp

losing

vs 1 year ago

0.0 pp

year-over-year

7-day trend

↓

falling

Drought context

Brazil drought →

Storage vs November average

99%of normal

69.8% now · 70.4% average (2 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.61 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
15 Nov 202669.8%67.5
14 Nov 202671.8%69.5
13 Nov 202678.6%76.1
12 Nov 202672.2%69.8
11 Nov 202670.5%68.2
10 Nov 202668.8%66.6
9 Nov 202667.4%65.2
8 Nov 202681.0%78.4
7 Nov 202676.9%74.4
6 Nov 202678.6%76.1
5 Nov 202676.9%74.4
4 Nov 202672.5%70.2

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity96.76 hm³
OperatorONS
Coordinates20.025°S, 47.436°W
Data source:ONS – Operador Nacional do Sistema Elétrico·Last reading: 2026-11-15

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 20.025°S, 47.436°W · Open in Google Maps

About JAGUARA

As of November 15, 2026, JAGUARA is at 69.8% of useful capacity, holding 67.5 hm³ of 96.76 hm³. Of the 494.32 hm³ total capacity, that is 13.7%. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has fallen by 11.2 percentage points, and it sits close to where it was a year earlier.

Across the readings we hold for JAGUARA — 65 data points between November 15, 2025 and November 15, 2026 — the level has ranged from a low of 52.3% (November 2, 2026) to a high of 82.7% (August 7, 2026). On average the reservoir is fullest around August and at its lowest around December.

It is operated by ONS primarily for hydroelectric power. It lies within the GRANDE basin at 20.025°S, 47.436°W.

Nearby reservoirs