IGARAPAVA
São Paulo · GRANDE
Useful capacity
15.14 hm³
Reported
November 12, 2026
59.7% of useful capacity
Current fill
59.7%of useful capacity
vs 7 days ago
+22.5 ppgaining
vs 1 year ago
+22.5 ppyear-over-year
7-day trend
↑rising
Drought context
Brazil drought →Storage vs November average
132%of normal
59.7% now · 45.1% average (2 yrs)
Rainfall, last 3 months
Near normal
SPI-3 +0.80 · to 21 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 12 Nov 2026 | 59.7% | 9 |
| 11 Nov 2026 | 52.2% | 7.9 |
| 10 Nov 2026 | 64.7% | 9.8 |
| 9 Nov 2026 | 100.0% | 15.1 |
| 8 Nov 2026 | 57.2% | 8.7 |
| 7 Nov 2026 | 79.8% | 12.1 |
| 6 Nov 2026 | 77.3% | 11.7 |
| 5 Nov 2026 | 37.2% | 5.6 |
| 4 Nov 2026 | 74.7% | 11.3 |
| 3 Nov 2026 | 64.7% | 9.8 |
| 2 Nov 2026 | 79.8% | 12.1 |
| 1 Nov 2026 | 52.2% | 7.9 |
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Usable capacity | 15.14 hm³ |
| Operator | ONS |
| Coordinates | 19.990°S, 47.754°W |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 19.990°S, 47.754°W · Open in Google Maps
About IGARAPAVA
As of November 12, 2026, IGARAPAVA is at 59.7% of useful capacity, holding 9 hm³ of 15.14 hm³. Of the 325.05 hm³ total capacity, that is 2.8%. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has risen by 22.5 percentage points, and it is 22.5 points above its level on the same date a year earlier.
Across the readings we hold for IGARAPAVA — 65 data points between November 12, 2025 and November 12, 2026 — the level has ranged from a low of 9.9% (November 28, 2025) to a high of 100.0% (April 17, 2026). On average the reservoir is fullest around April and at its lowest around March.
It is operated by ONS primarily for hydroelectric power. It lies within the GRANDE basin at 19.990°S, 47.754°W.

