← Victoria

Reservoir · Victoria · Australia · BOM Water Data Online

Upper Stony Creek No. 3

59.3% full

Capacity

3.7 hm³

Volume stored

2 hm³

River

Upper Stony Creek

Year completed

1918

Reported

November 9, 2026

Current fill

59.3%
Normal

vs 7 days ago

+2.3 pp

gaining

vs 1 year ago

+8.9 pp

year-over-year

7-day trend

↑

rising

Drought context

Australia drought →

Storage vs November average

87%of normal

59.3% now · 68.2% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.52 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
9 Nov 202659.3%2.19
8 Nov 202659.1%2.19
7 Nov 202658.9%2.18
6 Nov 202658.6%2.17
5 Nov 202658.4%2.16
4 Nov 202658.1%2.15
3 Nov 202657.7%2.13
2 Nov 202657.0%2.11
1 Nov 202656.8%2.1
31 Oct 202656.5%2.09
30 Oct 202656.2%2.08
29 Oct 202655.9%2.07

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Primary useWater supply
River basinUpper Stony Creek Basin
Coordinates37.820°S, 144.192°E

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-09.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.820°S, 144.192°E · Open in Google Maps

About Upper Stony Creek No. 3

As of November 9, 2026, Upper Stony Creek No. 3 is filled to 59.3% of its total capacity, holding 2.19 hm³ of water out of a maximum 3.7 hm³. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has risen by 2.3 percentage points, and it is 8.9 points above its level on the same date a year earlier.

Across the readings we hold for Upper Stony Creek No. 3 — 1087 data points between November 11, 2023 and November 9, 2026 — the level has ranged from a low of 24.2% (August 11, 2025) to a high of 97.0% (January 4, 2024). On average the reservoir is fullest around December and at its lowest around August.

The dam at Upper Stony Creek No. 3 was completed in 1918. It is operated by BOM primarily for water supply. It lies within the Upper Stony Creek Basin basin at 37.820°S, 144.192°E.

Nearby reservoirs