Reservoir · Victoria · Australia · BOM Water Data Online
Upper Stony Creek No. 2
73.6% full
Capacity
2.3 hm³
Volume stored
2 hm³
River
Upper Stony Creek
Year completed
1914
Coordinates
37.821°S, 144.203°E
Last updated
2026-09-08
Current fill
73.6%vs 7 days ago
+5.5%gaining
vs 1 year ago
-3.0%year-over-year
7-day trend
↑rising
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-08.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -37.821, 144.203 · Open in Google Maps
About Upper Stony Creek No. 2
As of September 8, 2026, Upper Stony Creek No. 2 is filled to 73.6% of its total capacity, holding roughly 2 hm³ of water out of a maximum 2 hm³. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has risen by 5.5 percentage points, and it is 3.0 points below its level on the same date a year earlier.
Across the readings we hold for Upper Stony Creek No. 2 — 1087 data points between September 10, 2023 and September 8, 2026 — the level has ranged from a low of 15.3% (May 4, 2025) to a high of 89.4% (December 27, 2023). On average the reservoir is fullest around October and at its lowest around May.
The dam at Upper Stony Creek No. 2 was completed in 1914. It is operated by BOM primarily for water supply. It lies within the Upper Stony Creek Basin basin at 37.821°S, 144.203°E.
Key facts
- Current fill level
- 73.6%
- Water stored
- 2 hm³
- Total capacity
- 2 hm³
- 7-day change
- ▲ 5.5 pts
- Year-on-year
- ▼ 3.0 pts
- Primary use
- Water supply
- River
- Upper Stony Creek
- River basin
- Upper Stony Creek Basin
- Year completed
- 1914
- Operator
- BOM
- Coordinates
- 37.821°S, 144.203°E
- Last updated
- September 8, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 8 Sep 2026 | 73.6% | 2 |
| 7 Sep 2026 | 73.1% | 2 |
| 6 Sep 2026 | 72.3% | 2 |
| 5 Sep 2026 | 71.2% | 2 |
| 4 Sep 2026 | 70.2% | 2 |
| 3 Sep 2026 | 69.2% | 2 |
| 2 Sep 2026 | 68.5% | 2 |
| 1 Sep 2026 | 68.1% | 2 |
| 31 Aug 2026 | 67.1% | 2 |
| 30 Aug 2026 | 66.1% | 2 |
| 29 Aug 2026 | 65.2% | 2 |
| 28 Aug 2026 | 64.2% | 2 |

