← Victoria

Reservoir · Victoria · Australia · BOM Water Data Online

Upper Stony Creek No. 1

56.8% full

Capacity

3.5 hm³

Volume stored

2 hm³

River

Upper Stony Creek

Year completed

1872

Reported

November 8, 2026

Current fill

56.8%
Normal

vs 7 days ago

+0.2 pp

gaining

vs 1 year ago

-9.4 pp

year-over-year

7-day trend

→

stable

Drought context

Australia drought →

Storage vs November average

84%of normal

56.8% now · 67.4% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.52 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
8 Nov 202656.8%1.99
7 Nov 202656.8%1.99
6 Nov 202656.8%1.99
5 Nov 202656.8%1.99
4 Nov 202656.8%1.99
3 Nov 202656.8%1.99
2 Nov 202656.6%1.98
1 Nov 202656.6%1.98
31 Oct 202656.6%1.98
30 Oct 202656.6%1.98
29 Oct 202656.6%1.98
28 Oct 202656.6%1.98

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Primary useWater supply
River basinUpper Stony Creek Basin
Coordinates37.828°S, 144.203°E

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-08.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.828°S, 144.203°E · Open in Google Maps

About Upper Stony Creek No. 1

As of November 8, 2026, Upper Stony Creek No. 1 is filled to 56.8% of its total capacity, holding 1.99 hm³ of water out of a maximum 3.5 hm³. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has held broadly steady (+0.2 pp), and it is 9.4 points below its level on the same date a year earlier.

Across the readings we hold for Upper Stony Creek No. 1 — 1087 data points between November 10, 2023 and November 8, 2026 — the level has ranged from a low of 55.2% (September 20, 2026) to a high of 71.7% (January 3, 2024). On average the reservoir is fullest around December and at its lowest around September.

The dam at Upper Stony Creek No. 1 was completed in 1872. It is operated by BOM primarily for water supply. It lies within the Upper Stony Creek Basin basin at 37.828°S, 144.203°E.

Nearby reservoirs