Reservoir · Victoria · Australia · BOM Water Data Online
Upper Stony Creek No. 1
56.2% full
Capacity
3.5 hm³
Volume stored
2 hm³
River
Upper Stony Creek
Year completed
1872
Coordinates
37.828°S, 144.203°E
Last updated
2026-09-09
Current fill
56.2%vs 7 days ago
+0.1%gaining
vs 1 year ago
-10.9%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-09.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -37.828, 144.203 · Open in Google Maps
About Upper Stony Creek No. 1
As of September 9, 2026, Upper Stony Creek No. 1 is filled to 56.2% of its total capacity, holding roughly 2 hm³ of water out of a maximum 4 hm³. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has held broadly steady (+0.1 pts), and it is 10.9 points below its level on the same date a year earlier.
Across the readings we hold for Upper Stony Creek No. 1 — 1087 data points between September 11, 2023 and September 9, 2026 — the level has ranged from a low of 56.1% (August 29, 2026) to a high of 72.8% (January 9, 2024). On average the reservoir is fullest around October and at its lowest around August.
The dam at Upper Stony Creek No. 1 was completed in 1872. It is operated by BOM primarily for water supply. It lies within the Upper Stony Creek Basin basin at 37.828°S, 144.203°E.
Key facts
- Current fill level
- 56.2%
- Water stored
- 2 hm³
- Total capacity
- 4 hm³
- 7-day change
- ▲ 0.1 pts
- Year-on-year
- ▼ 10.9 pts
- Primary use
- Water supply
- River
- Upper Stony Creek
- River basin
- Upper Stony Creek Basin
- Year completed
- 1872
- Operator
- BOM
- Coordinates
- 37.828°S, 144.203°E
- Last updated
- September 9, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 9 Sep 2026 | 56.2% | 2 |
| 8 Sep 2026 | 56.2% | 2 |
| 7 Sep 2026 | 56.2% | 2 |
| 6 Sep 2026 | 56.2% | 2 |
| 5 Sep 2026 | 56.1% | 2 |
| 4 Sep 2026 | 56.1% | 2 |
| 3 Sep 2026 | 56.1% | 2 |
| 2 Sep 2026 | 56.1% | 2 |
| 1 Sep 2026 | 56.1% | 2 |
| 31 Aug 2026 | 56.1% | 2 |
| 30 Aug 2026 | 56.1% | 2 |
| 29 Aug 2026 | 56.1% | 2 |

