Reservoir · Victoria · Australia · BOM Water Data Online
Lauriston
95.7% full
Capacity
19.8 hm³
Volume stored
19 hm³
River
Coliban river
Year completed
1941
Coordinates
37.257°S, 144.383°E
Last updated
2026-09-07
Current fill
95.7%vs 7 days ago
+0.6%gaining
vs 1 year ago
+13.0%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-07.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -37.257, 144.383 · Open in Google Maps
About Lauriston
As of September 7, 2026, Lauriston is filled to 95.7% of its total capacity, holding roughly 19 hm³ of water out of a maximum 20 hm³. At this level the reservoir is high.
Over the most recent week on record the fill level has held broadly steady (+0.6 pts), and it is 13.0 points above its level on the same date a year earlier.
Across the readings we hold for Lauriston — 1080 data points between September 10, 2023 and September 7, 2026 — the level has ranged from a low of 69.7% (July 21, 2025) to a high of 100.0% (September 25, 2023). On average the reservoir is fullest around January and at its lowest around June.
The dam at Lauriston was completed in 1941. It is operated by BOM primarily for water supply. It lies within the Coliban river Basin basin at 37.257°S, 144.383°E.
Key facts
- Current fill level
- 95.7%
- Water stored
- 19 hm³
- Total capacity
- 20 hm³
- 7-day change
- ▲ 0.6 pts
- Year-on-year
- ▲ 13.0 pts
- Primary use
- Water supply
- River
- Coliban river
- River basin
- Coliban river Basin
- Year completed
- 1941
- Operator
- BOM
- Coordinates
- 37.257°S, 144.383°E
- Last updated
- September 7, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 7 Sep 2026 | 95.7% | 19 |
| 6 Sep 2026 | 95.8% | 19 |
| 5 Sep 2026 | 95.0% | 19 |
| 4 Sep 2026 | 94.4% | 19 |
| 3 Sep 2026 | 94.5% | 19 |
| 2 Sep 2026 | 94.7% | 19 |
| 1 Sep 2026 | 94.9% | 19 |
| 31 Aug 2026 | 95.1% | 19 |
| 30 Aug 2026 | 95.1% | 19 |
| 29 Aug 2026 | 95.0% | 19 |
| 28 Aug 2026 | 95.0% | 19 |
| 27 Aug 2026 | 94.8% | 19 |

