Reservoir · Victoria · Australia · BOM Water Data Online
Barkers Creek
100.4% full
Capacity
1.7 hm³
Volume stored
2 hm³
River
Barkers Creek
Year completed
1869
Coordinates
36.965°S, 144.278°E
Last updated
2026-09-06
Current fill
100.4%vs 7 days ago
-2.0%losing
vs 1 year ago
+62.4%year-over-year
7-day trend
↓falling
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-06.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -36.965, 144.278 · Open in Google Maps
About Barkers Creek
As of September 6, 2026, Barkers Creek is filled to 100.4% of its total capacity, holding roughly 2 hm³ of water out of a maximum 2 hm³. At this level the reservoir is effectively full.
Over the most recent week on record the fill level has fallen by 2.0 percentage points, and it is 62.4 points above its level on the same date a year earlier.
Across the readings we hold for Barkers Creek — 1057 data points between September 10, 2023 and September 6, 2026 — the level has ranged from a low of 28.6% (May 26, 2025) to a high of 123.8% (October 5, 2023). On average the reservoir is fullest around October and at its lowest around June.
The dam at Barkers Creek was completed in 1869. It is operated by BOM primarily for water supply. It lies within the Barkers Creek Basin basin at 36.965°S, 144.278°E.
Key facts
- Current fill level
- 100.4%
- Water stored
- 2 hm³
- Total capacity
- 2 hm³
- 7-day change
- ▼ 2.0 pts
- Year-on-year
- ▲ 62.4 pts
- Primary use
- Water supply
- River
- Barkers Creek
- River basin
- Barkers Creek Basin
- Year completed
- 1869
- Operator
- BOM
- Coordinates
- 36.965°S, 144.278°E
- Last updated
- September 6, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 6 Sep 2026 | 100.4% | 2 |
| 5 Sep 2026 | 101.2% | 2 |
| 4 Sep 2026 | 102.0% | 2 |
| 3 Sep 2026 | 102.4% | 2 |
| 2 Sep 2026 | 102.4% | 2 |
| 1 Sep 2026 | 102.4% | 2 |
| 31 Aug 2026 | 102.4% | 2 |
| 30 Aug 2026 | 102.4% | 2 |
| 29 Aug 2026 | 102.4% | 2 |
| 28 Aug 2026 | 102.4% | 2 |
| 27 Aug 2026 | 101.8% | 2 |
| 26 Aug 2026 | 100.6% | 2 |

