Reservoir · Queensland · Australia · BOM Water Data Online
Hinze
97.0% full
Capacity
310.7 hm³
Volume stored
301 hm³
River
Nerang River
Year completed
1989
Coordinates
28.101°S, 153.252°E
Last updated
2026-09-09
Current fill
97.0%vs 7 days ago
-0.4%losing
vs 1 year ago
-0.4%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-09.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -28.101, 153.252 · Open in Google Maps
About Hinze
As of September 9, 2026, Hinze is filled to 97.0% of its total capacity, holding roughly 301 hm³ of water out of a maximum 311 hm³. At this level the reservoir is high.
Over the most recent week on record the fill level has held broadly steady (-0.4 pts), and it sits close to where it was a year earlier.
Across the readings we hold for Hinze — 1025 data points between September 11, 2023 and September 9, 2026 — the level has ranged from a low of 77.8% (December 25, 2023) to a high of 125.3% (March 10, 2025). On average the reservoir is fullest around March and at its lowest around November.
The dam at Hinze was completed in 1989. It is operated by BOM primarily for water supply. It lies within the Nerang River Basin basin at 28.101°S, 153.252°E.
Key facts
- Current fill level
- 97.0%
- Water stored
- 301 hm³
- Total capacity
- 311 hm³
- 7-day change
- ▼ 0.4 pts
- Year-on-year
- ▼ 0.4 pts
- Primary use
- Water supply
- River
- Nerang River
- River basin
- Nerang River Basin
- Year completed
- 1989
- Operator
- BOM
- Coordinates
- 28.101°S, 153.252°E
- Last updated
- September 9, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 9 Sep 2026 | 97.0% | 301 |
| 8 Sep 2026 | 97.0% | 301 |
| 7 Sep 2026 | 97.1% | 302 |
| 6 Sep 2026 | 97.1% | 302 |
| 4 Sep 2026 | 97.3% | 302 |
| 3 Sep 2026 | 97.3% | 302 |
| 2 Sep 2026 | 97.4% | 303 |
| 1 Sep 2026 | 97.4% | 303 |
| 31 Aug 2026 | 97.5% | 303 |
| 30 Aug 2026 | 97.6% | 303 |
| 28 Aug 2026 | 97.7% | 304 |
| 27 Aug 2026 | 97.7% | 304 |

