← Queensland

Reservoir · Queensland · Australia · BOM Water Data Online

Enoggera

100.4% full

Capacity

4.262 hm³

Volume stored

4 hm³

River

Enoggera Creek

Year completed

1866

Reported

November 13, 2026

Current fill

100.4%
Full

vs 7 days ago

-0.2 pp

losing

vs 1 year ago

+4.6 pp

year-over-year

7-day trend

→

stable

Drought context

Australia drought →

Storage vs November average

101%of normal

100.4% now · 99.8% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 +0.83 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
13 Nov 2026100.4%4.278
11 Nov 2026100.2%4.27
10 Nov 2026100.2%4.27
9 Nov 2026100.3%4.27
8 Nov 2026100.4%4.28
7 Nov 2026100.5%4.28
6 Nov 2026100.6%4.29
5 Nov 2026100.7%4.29
4 Nov 2026100.9%4.3
3 Nov 2026101.0%4.3
2 Nov 2026101.1%4.31
1 Nov 2026101.3%4.32

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Primary useWater supply
River basinEnoggera Creek Basin
Coordinates27.446°S, 152.920°E

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-13.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 27.446°S, 152.920°E · Open in Google Maps

About Enoggera

As of November 13, 2026, Enoggera is filled to 100.4% of its total capacity, holding 4.278 hm³ of water out of a maximum 4.262 hm³. At this level the reservoir is effectively full.

Over the most recent week on record the fill level has held broadly steady (-0.2 pp), and it is 4.6 points above its level on the same date a year earlier.

Across the readings we hold for Enoggera — 891 data points between November 29, 2023 and November 13, 2026 — the level has ranged from a low of 93.5% (November 29, 2023) to a high of 138.4% (March 11, 2025). On average the reservoir is fullest around December and at its lowest around October.

The dam at Enoggera was completed in 1866. It is operated by Seqwater primarily for water supply. It lies within the Enoggera Creek Basin basin at 27.446°S, 152.920°E.

Nearby reservoirs