Reservoir · Queensland · Australia · BOM Water Data Online
Moogerah
100.7% full
Capacity
83.765 hm³
Volume stored
84 hm³
River
Reynolds Creek
Year completed
1961
Reported
November 10, 2026
Current fill
100.7%vs 7 days ago
-0.7 pplosing
vs 1 year ago
+5.9 ppyear-over-year
7-day trend
→stable
Drought context
Australia drought →Storage vs November average
109%of normal
100.7% now · 92.6% average (4 yrs)
Rainfall, last 3 months
Near normal
SPI-3 +0.71 · to 21 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-10.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 28.046°S, 152.540°E · Open in Google Maps
On the map
Zoom out for the other countries we track · click one to open itLoading map…
About Moogerah
As of November 10, 2026, Moogerah is filled to 100.7% of its total capacity, holding 84.335 hm³ of water out of a maximum 83.765 hm³. At this level the reservoir is effectively full.
Over the most recent week on record the fill level has held broadly steady (-0.7 pp), and it is 5.9 points above its level on the same date a year earlier.
Across the readings we hold for Moogerah — 892 data points between November 20, 2023 and November 10, 2026 — the level has ranged from a low of 75.5% (October 18, 2026) to a high of 115.3% (March 11, 2025). On average the reservoir is fullest around January and at its lowest around October.
The dam at Moogerah was completed in 1961. It is operated by Seqwater primarily for water supply. It lies within the Reynolds Creek Basin basin at 28.046°S, 152.540°E.
Key facts
- Current fill level
- 100.7% of total capacity
- Water stored
- 84.335 hm³
- Total capacity
- 83.765 hm³
- 7-day change
- ▼ 0.7 pp
- Year-on-year
- ▲ 5.9 pp
- Primary use
- Water supply
- River
- Reynolds Creek
- River basin
- Reynolds Creek Basin
- Year completed
- 1961
- Operator
- Seqwater
- Coordinates
- 28.046°S, 152.540°E
- Last updated
- November 10, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 10 Nov 2026 | 100.7% | 84.335 |
| 7 Nov 2026 | 101.0% | 84.59 |
| 6 Nov 2026 | 101.1% | 84.71 |
| 5 Nov 2026 | 101.3% | 84.86 |
| 4 Nov 2026 | 101.5% | 84.99 |
| 3 Nov 2026 | 101.4% | 84.97 |
| 2 Nov 2026 | 101.6% | 85.1 |
| 1 Nov 2026 | 101.8% | 85.27 |
| 31 Oct 2026 | 102.0% | 85.46 |
| 30 Oct 2026 | 102.4% | 85.76 |
| 29 Oct 2026 | 102.8% | 86.11 |
| 28 Oct 2026 | 103.2% | 86.47 |

