reservoirs.earth logo
Reservoirs.EARTH
Queensland

Reservoir · Queensland · Australia · BOM Water Data Online

Bill Gunn

82.8% full

Capacity

6.9 hm³

Volume stored

6 hm³

Year completed

1987

Coordinates

27.630°S, 152.374°E

Last updated

2026-06-10

Current fill

82.8%
High

vs 7 days ago

0.0%

stable

vs 1 year ago

-8.4%

year-over-year

7-day trend

stable

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-06-10.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -27.630, 152.374 · Open in Google Maps

About Bill Gunn

As of June 10, 2026, Bill Gunn is filled to 82.8% of its total capacity, holding roughly 6 hm³ of water out of a maximum 7 hm³. At this level the reservoir is high.

Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it is 8.4 points below its level on the same date a year earlier.

Across the readings we hold for Bill Gunn — 701 data points between August 18, 2023 and June 10, 2026 — the level has ranged from a low of 39.2% (January 12, 2024) to a high of 103.1% (March 11, 2025). On average the reservoir is fullest around July and at its lowest around December.

The dam at Bill Gunn was completed in 1987. It is operated by BOM primarily for water supply.

Key facts

Current fill level
82.8%
Water stored
6 hm³
Total capacity
7 hm³
7-day change
No change
Year-on-year
▼ 8.4 pts
Primary use
Water supply
Year completed
1987
Operator
BOM
Coordinates
27.630°S, 152.374°E
Last updated
June 10, 2026

Recent readings

DateFill levelVolume (hm³)
10 Jun 202682.8%6
9 Jun 202682.8%6
8 Jun 202683.0%6
7 Jun 202683.1%6
6 Jun 202683.3%6
5 Jun 202683.4%6
4 Jun 202683.6%6
3 Jun 202683.8%6
2 Jun 202684.0%6
1 Jun 202684.2%6
31 May 202684.4%6
30 May 202684.6%6

Frequently asked questions

What is the current water level of Bill Gunn?

As of June 10, 2026, Bill Gunn is at 82.8% of its capacity, holding approximately 6 hm³ of water, according to BOM data.

Is Bill Gunn reservoir full?

No. As of June 10, 2026, Bill Gunn is high at 82.8% of its capacity, so it is not full.

Is the water level at Bill Gunn rising or falling?

The level at Bill Gunn has been broadly stable over the latest week on record (0.0 points).

How much water can Bill Gunn hold?

Bill Gunn has a total capacity of 7 hm³.

Where is Bill Gunn reservoir located?

Bill Gunn is located in Queensland, Australia (coordinates 27.630°S, 152.374°E).

When was Bill Gunn dam built?

The dam at Bill Gunn was completed in 1987.

What is Bill Gunn used for?

Bill Gunn is used primarily for water supply, and is managed by BOM.

Nearby reservoirs

ShareXLinkedInWhatsApp