Reservoir · Victoria · Australia · BOM Water Data Online
Evansford
101.9% full
Capacity
1.4 hm³
Volume stored
1 hm³
River
McCallum Cree
Year completed
1885
Coordinates
37.279°S, 143.654°E
Last updated
2026-09-09
Current fill
101.9%vs 7 days ago
-0.3%losing
vs 1 year ago
+30.4%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-09.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -37.279, 143.654 · Open in Google Maps
About Evansford
As of September 9, 2026, Evansford is filled to 101.9% of its total capacity, holding roughly 1 hm³ of water out of a maximum 1 hm³. At this level the reservoir is effectively full.
Over the most recent week on record the fill level has held broadly steady (-0.3 pts), and it is 30.4 points above its level on the same date a year earlier.
Across the readings we hold for Evansford — 649 data points between November 26, 2024 and September 9, 2026 — the level has ranged from a low of 52.2% (June 3, 2025) to a high of 104.0% (August 21, 2026). On average the reservoir is fullest around October and at its lowest around May.
The dam at Evansford was completed in 1885. It is operated by BOM primarily for water supply. It lies within the McCallum Cree Basin basin at 37.279°S, 143.654°E.
Key facts
- Current fill level
- 101.9%
- Water stored
- 1 hm³
- Total capacity
- 1 hm³
- 7-day change
- ▼ 0.3 pts
- Year-on-year
- ▲ 30.4 pts
- Primary use
- Water supply
- River
- McCallum Cree
- River basin
- McCallum Cree Basin
- Year completed
- 1885
- Operator
- BOM
- Coordinates
- 37.279°S, 143.654°E
- Last updated
- September 9, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 9 Sep 2026 | 101.9% | 1 |
| 8 Sep 2026 | 102.2% | 1 |
| 7 Sep 2026 | 102.4% | 1 |
| 6 Sep 2026 | 102.8% | 1 |
| 5 Sep 2026 | 102.9% | 1 |
| 4 Sep 2026 | 101.9% | 1 |
| 3 Sep 2026 | 102.1% | 1 |
| 2 Sep 2026 | 102.2% | 1 |
| 1 Sep 2026 | 102.1% | 1 |
| 31 Aug 2026 | 102.2% | 1 |
| 30 Aug 2026 | 102.2% | 1 |
| 29 Aug 2026 | 102.3% | 1 |

