Reservoir · Victoria · Australia · BOM Water Data Online
Gong Gong
Current fill: N/A
Capacity
1.6 hm³
Volume stored
N/A
River
Fellmeongers Creek
Year completed
1877
Coordinates
37.545°S, 143.935°E
Not currently reporting
The most recent reading for this reservoir is from 2023-07-08, more than 45 days ago, so the current fill is shown as N/A. The history below reflects that older reading.
Current fill
N/Avs 7 days ago
N/Avs 1 year ago
N/A7-day trend
N/AData source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML).
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -37.545, 143.935 · Open in Google Maps
About Gong Gong
The dam at Gong Gong was completed in 1877. It is operated by BOM primarily for water supply. It lies within the Fellmeongers Creek Basin basin at 37.545°S, 143.935°E.
Key facts
- Total capacity
- 2 hm³
- Primary use
- Water supply
- River
- Fellmeongers Creek
- River basin
- Fellmeongers Creek Basin
- Year completed
- 1877
- Operator
- BOM
- Coordinates
- 37.545°S, 143.935°E
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 8 Jul 2023 | 78.5% | 1 |
| 7 Jul 2023 | 77.9% | 1 |
| 6 Jul 2023 | 77.4% | 1 |
| 5 Jul 2023 | 77.0% | 1 |
| 4 Jul 2023 | 76.4% | 1 |
| 3 Jul 2023 | 76.0% | 1 |
| 2 Jul 2023 | 75.6% | 1 |
| 1 Jul 2023 | 75.0% | 1 |
| 30 Jun 2023 | 74.4% | 1 |
| 29 Jun 2023 | 74.0% | 1 |
| 28 Jun 2023 | 73.5% | 1 |
| 27 Jun 2023 | 73.0% | 1 |
Frequently asked questions
How much water can Gong Gong hold?
Gong Gong has a total capacity of 2 hm³.
Where is Gong Gong reservoir located?
Gong Gong is located in Victoria, Australia, within the Fellmeongers Creek Basin basin (coordinates 37.545°S, 143.935°E).
When was Gong Gong dam built?
The dam at Gong Gong was completed in 1877.
What is Gong Gong used for?
Gong Gong is used primarily for water supply, and is managed by BOM.

