Reservoir · Victoria · Australia · BOM Water Data Online
Wilsons
98.6% full
Capacity
1 hm³
Volume stored
1 hm³
River
Lal Lal Creek
Year completed
1891
Coordinates
37.510°S, 144.019°E
Last updated
2026-08-30
Current fill
98.6%vs 7 days ago
+10.2%gaining
vs 1 year ago
+86.1%year-over-year
7-day trend
↑rising
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-08-30.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -37.510, 144.019 · Open in Google Maps
About Wilsons
As of August 30, 2026, Wilsons is filled to 98.6% of its total capacity, holding roughly 1 hm³ of water out of a maximum 1 hm³. At this level the reservoir is high.
Over the most recent week on record the fill level has risen by 10.2 percentage points, and it is 86.1 points above its level on the same date a year earlier.
Across the readings we hold for Wilsons — 1071 data points between September 10, 2023 and August 30, 2026 — the level has ranged from a low of 0.0% (May 25, 2025) to a high of 98.6% (August 30, 2026). On average the reservoir is fullest around August and at its lowest around April.
The dam at Wilsons was completed in 1891. It is operated by BOM primarily for water supply. It lies within the Lal Lal Creek Basin basin at 37.510°S, 144.019°E.
Key facts
- Current fill level
- 98.6%
- Water stored
- 1 hm³
- Total capacity
- 1 hm³
- 7-day change
- ▲ 10.2 pts
- Year-on-year
- ▲ 86.1 pts
- Primary use
- Water supply
- River
- Lal Lal Creek
- River basin
- Lal Lal Creek Basin
- Year completed
- 1891
- Operator
- BOM
- Coordinates
- 37.510°S, 144.019°E
- Last updated
- August 30, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 30 Aug 2026 | 98.6% | 1 |
| 29 Aug 2026 | 97.5% | 1 |
| 28 Aug 2026 | 96.3% | 1 |
| 27 Aug 2026 | 95.0% | 1 |
| 26 Aug 2026 | 93.6% | 1 |
| 25 Aug 2026 | 91.9% | 1 |
| 24 Aug 2026 | 89.8% | 1 |
| 23 Aug 2026 | 88.4% | 1 |
| 22 Aug 2026 | 86.9% | 1 |
| 21 Aug 2026 | 85.1% | 1 |
| 20 Aug 2026 | 82.9% | 1 |
| 19 Aug 2026 | 80.3% | 1 |

