Villalcampo
Zamora · Castile and León · Duero
Capacity
66 hm³
Coordinates
41.493°N, 6.084°W
Operator
CHD
95.5% full
Current fill
95.5%vs 7 days ago
+3.1%gaining
vs 1 year ago
+1.6%year-over-year
7-day trend
↑rising
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 66 hm³ |
| Usable capacity | 59.4 hm³ |
| Primary use | Multi-purpose |
| Operator | CHD |
| Province | Zamora |
| Autonomous community | Castile and León |
| River basin | Duero |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 41.493, -6.084 · Open in Google Maps
About Villalcampo
As of September 7, 2026, Villalcampo is filled to 95.5% of its total capacity, holding roughly 63 hm³ of water out of a maximum 66 hm³. At this level the reservoir is high. Of that total, about 59 hm³ is usable (live) storage.
Over the most recent week on record the fill level has risen by 3.1 percentage points, and it is 1.6 points above its level on the same date a year earlier.
Across the readings we hold for Villalcampo — 419 data points between September 4, 2018 and September 7, 2026 — the level has ranged from a low of 62.1% (April 16, 2024) to a high of 100.0% (January 8, 2019). On average the reservoir is fullest around October and at its lowest around April.
It is operated by CHD primarily for multiple purposes. It lies within the Duero basin at 41.493°N, 6.084°W.
Key facts
- Current fill level
- 95.5%
- Water stored
- 63 hm³
- Total capacity
- 66 hm³
- Usable capacity
- 59 hm³
- 7-day change
- ▲ 3.1 pts
- Year-on-year
- ▲ 1.6 pts
- Primary use
- Multipurpose
- River basin
- Duero
- Operator
- CHD
- Coordinates
- 41.493°N, 6.084°W
- Last updated
- September 7, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 7 Sep 2026 | 95.5% | 63 |
| 1 Sep 2026 | 92.4% | 61 |
| 25 Aug 2026 | 93.9% | 62 |
| 18 Aug 2026 | 93.9% | 62 |
| 11 Aug 2026 | 90.9% | 60 |
| 4 Aug 2026 | 89.4% | 59 |
| 28 Jul 2026 | 93.9% | 62 |
| 21 Jul 2026 | 84.8% | 56 |
| 14 Jul 2026 | 93.9% | 62 |
| 7 Jul 2026 | 95.5% | 63 |
| 30 Jun 2026 | 90.9% | 60 |
| 23 Jun 2026 | 95.5% | 63 |

