← Castile and León
NormalMulti-purpose

Almendra

Salamanca · Castile and León · Duero

Capacity

2,649 hm³

Reported

November 9, 2026

42.7% full

Current fill

42.7%
Normal

vs 7 days ago

-4.0 pp

losing

vs 1 year ago

-22.6 pp

year-over-year

7-day trend

↓

falling

Drought context

Spain drought →

Storage vs November average

71%of normal

42.7% now · 60.1% average (9 yrs)

Rainfall, last 3 months

Moderately dry

SPI-3 −1.13 · to 21 Oct 2026

EU drought indicator

None

No drought signal · to 11 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3) · Copernicus EDO (CDI).

Recent readings

DateFill levelVolume (hm³)
9 Nov 202642.7%1,132
2 Nov 202646.7%1,237
27 Oct 202649.8%1,318
20 Oct 202651.8%1,371
13 Oct 202653.7%1,422
6 Oct 202655.8%1,477
29 Sep 202659.6%1,580
22 Sep 202662.1%1,645
15 Sep 202664.0%1,695
8 Sep 202666.2%1,753
1 Sep 202669.1%1,830
25 Aug 202670.4%1,864

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

OperatorCHD
RiverTormes
Coordinates41.237°N, 6.240°W
Data source:embalses.net·Last reading: 2026-11-09

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 41.237°N, 6.240°W · Open in Google Maps

About Almendra

As of November 9, 2026, Almendra is filled to 42.7% of its total capacity, holding 1,132 hm³ of water out of a maximum 2,649 hm³. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has fallen by 4.0 percentage points, and it is 22.6 points below its level on the same date a year earlier.

Across the readings we hold for Almendra — 420 data points between October 30, 2018 and November 9, 2026 — the level has ranged from a low of 25.1% (September 27, 2022) to a high of 96.3% (May 27, 2025). On average the reservoir is fullest around June and at its lowest around November.

It is operated by CHD primarily for multiple purposes. It lies within the Duero basin at 41.237°N, 6.240°W.

Nearby reservoirs