reservoirs.earth logo
Reservoirs.EARTH
Extremadura
HighMulti-purpose

Tentudía

Badajoz · Extremadura · Guadiana

Capacity

5 hm³

Coordinates

38.094°N, 6.316°W

Operator

CHSU

80.0% full

Current fill

80.0%
High

vs 7 days ago

0.0%

stable

vs 1 year ago

0.0%

year-over-year

7-day trend

stable

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity5 hm³
Usable capacity4.5 hm³
Primary useMulti-purpose
OperatorCHSU
ProvinceBadajoz
Autonomous communityExtremadura
River basinGuadiana
Data source:embalses.net·Last reading: 2026-07-27

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 38.094, -6.316 · Open in Google Maps

About Tentudía

As of July 27, 2026, Tentudía is filled to 80.0% of its total capacity, holding roughly 4 hm³ of water out of a maximum 5 hm³. At this level the reservoir is high.

Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it sits close to where it was a year earlier.

Across the readings we hold for Tentudía — 420 data points between July 17, 2018 and July 27, 2026 — the level has ranged from a low of 0.0% (August 22, 2023) to a high of 100.0% (July 17, 2018). On average the reservoir is fullest around April and at its lowest around November.

It is operated by CHSU primarily for multiple purposes. It lies within the Guadiana basin at 38.094°N, 6.316°W.

Key facts

Current fill level
80.0%
Water stored
4 hm³
Total capacity
5 hm³
7-day change
No change
Year-on-year
No change
Primary use
Multipurpose
River basin
Guadiana
Operator
CHSU
Coordinates
38.094°N, 6.316°W
Last updated
July 27, 2026

Recent readings

DateFill levelVolume (hm³)
27 Jul 202680.0%4
20 Jul 202680.0%4
14 Jul 2026100.0%5
7 Jul 2026100.0%5
30 Jun 2026100.0%5
23 Jun 2026100.0%5
16 Jun 2026100.0%5
9 Jun 2026100.0%5
2 Jun 2026100.0%5
26 May 2026100.0%5
19 May 2026100.0%5
12 May 2026100.0%5

Frequently asked questions

What is the current water level of Tentudía?

As of July 27, 2026, Tentudía is at 80.0% of its capacity, holding approximately 4 hm³ of water, according to embalses.net data.

Is Tentudía reservoir full?

No. As of July 27, 2026, Tentudía is high at 80.0% of its capacity, so it is not full.

Is the water level at Tentudía rising or falling?

The level at Tentudía has been broadly stable over the latest week on record (0.0 points).

How much water can Tentudía hold?

Tentudía has a total capacity of 5 hm³.

Where is Tentudía reservoir located?

Tentudía is located in Badajoz, Extremadura, Spain, within the Guadiana basin (coordinates 38.094°N, 6.316°W).

What is Tentudía used for?

Tentudía is used primarily for multiple purposes, and is managed by CHSU.

Nearby reservoirs

ShareXLinkedInWhatsApp