Tentudía
Badajoz · Extremadura · Guadiana
Capacity
5 hm³
Coordinates
38.094°N, 6.316°W
Operator
CHSU
80.0% full
Current fill
80.0%vs 7 days ago
0.0%stable
vs 1 year ago
0.0%year-over-year
7-day trend
→stable
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 5 hm³ |
| Usable capacity | 4.5 hm³ |
| Primary use | Multi-purpose |
| Operator | CHSU |
| Province | Badajoz |
| Autonomous community | Extremadura |
| River basin | Guadiana |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 38.094, -6.316 · Open in Google Maps
About Tentudía
As of July 27, 2026, Tentudía is filled to 80.0% of its total capacity, holding roughly 4 hm³ of water out of a maximum 5 hm³. At this level the reservoir is high.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it sits close to where it was a year earlier.
Across the readings we hold for Tentudía — 420 data points between July 17, 2018 and July 27, 2026 — the level has ranged from a low of 0.0% (August 22, 2023) to a high of 100.0% (July 17, 2018). On average the reservoir is fullest around April and at its lowest around November.
It is operated by CHSU primarily for multiple purposes. It lies within the Guadiana basin at 38.094°N, 6.316°W.
Key facts
- Current fill level
- 80.0%
- Water stored
- 4 hm³
- Total capacity
- 5 hm³
- 7-day change
- No change
- Year-on-year
- No change
- Primary use
- Multipurpose
- River basin
- Guadiana
- Operator
- CHSU
- Coordinates
- 38.094°N, 6.316°W
- Last updated
- July 27, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 27 Jul 2026 | 80.0% | 4 |
| 20 Jul 2026 | 80.0% | 4 |
| 14 Jul 2026 | 100.0% | 5 |
| 7 Jul 2026 | 100.0% | 5 |
| 30 Jun 2026 | 100.0% | 5 |
| 23 Jun 2026 | 100.0% | 5 |
| 16 Jun 2026 | 100.0% | 5 |
| 9 Jun 2026 | 100.0% | 5 |
| 2 Jun 2026 | 100.0% | 5 |
| 26 May 2026 | 100.0% | 5 |
| 19 May 2026 | 100.0% | 5 |
| 12 May 2026 | 100.0% | 5 |
Frequently asked questions
What is the current water level of Tentudía?
As of July 27, 2026, Tentudía is at 80.0% of its capacity, holding approximately 4 hm³ of water, according to embalses.net data.
Is Tentudía reservoir full?
No. As of July 27, 2026, Tentudía is high at 80.0% of its capacity, so it is not full.
Is the water level at Tentudía rising or falling?
The level at Tentudía has been broadly stable over the latest week on record (0.0 points).
How much water can Tentudía hold?
Tentudía has a total capacity of 5 hm³.
Where is Tentudía reservoir located?
Tentudía is located in Badajoz, Extremadura, Spain, within the Guadiana basin (coordinates 38.094°N, 6.316°W).
What is Tentudía used for?
Tentudía is used primarily for multiple purposes, and is managed by CHSU.

